ITAC Assessment: LE0498
ITAC logo
ITAC Assessment: LE0498
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Fat Liquors and Specialty Chemicals
NAICS 325613: Surface Active Agent Manufacturing
SIC 2843: Surface Active Agents, Finishing Agents, Sulfonated Oils, and Assistants
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 80,000
ft2
Annual Production 500
Tgal
Production Hrs. Annual 2,184
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,783 605,244
kWh
Electricity Demand $15,716 2,272
kW-mo/yr
Electricity Fees $11,336 -
Natural Gas $95,069 13,409
MMBtu
TOTAL YEARLY COSTS $184,904
RECOMMENDED SAVINGS* $25,947 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $6,052 - - - - $6,052
02 2.7441: Replace broken windows and/or window sash $226 $50 - - $226
-
MMBtu
-
03 2.2136: Install / repair insulation on steam lines $5,147 $9,248 - - $5,147
-
MMBtu
-
04 2.7232: Replace existing hvac unit with high efficiency model $1,427 $3,800 $1,206
11,605
kWh
$221
-
kW-mo/yr
- -
05 2.2442: Preheat combustion air with waste heat $11,592 $40,000 - - $11,592
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,503 $7,000 - - $1,503
-
MMBtu
-
TOTAL RECOMMENDED $25,947 $60,098 $1,206
11,605
kWh
$221
-
kW-mo/yr
$18,468
-
MMBtu
$6,052
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs