Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

115

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC In vitro and in vivo diagnostic substances
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IA0303 #09 Y:2002 Automate finishing process $194,737 $280,000
IA0303 #08 Y:2002 Install equipment to move product $37,995 $61,650
IA0303 #07 Y:2002 Install occupancy sensors $138 $200
IA0303 #06 Y:2002 Utilize higher efficiency lamps and/or ballasts $3,059 $10,890
IA0303 #05 Y:2002 Recover waste heat from equipment $711 $1,800
IA0303 #04 Y:2002 Install back-up equipment $5,666 $9,824
IA0303 #03 Y:2002 Reduce the pressure of compressed air to the minimum required $246 $15
IA0303 #02 Y:2002 Install compressor air intakes in coolest locations $404 $130
IA0303 #01 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $863 $162
MA0477 #06 Y:2000 Install occupancy sensors $410 $500
MA0477 #05 Y:2000 Use adjustable frequency drive or multiple speed motors on existing system $3,200 $11,700
MA0477 #04 Y:2000 Reduce space conditioning during non-working hours $3,910 -
MA0477 #03 Y:2000 Use cooling tower or economizer to replace chiller cooling $6,580 $21,000
MA0477 #02 Y:2000 Recover waste heat from equipment $21,290 $103,000
MA0477 #01 Y:2000 Chill water to the highest temperature possible $22,890 $2,000
SD0231 #03 Y:1999 Schedule deliveries according to demand $7,020 -
SD0231 #02 Y:1999 Replace existing chiller with high efficiency model $7,622 $3,600
SD0231 #01 Y:1999 Utilize higher efficiency lamps and/or ballasts $7,674 $10,286
HO0077 #05 Y:1994 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $221,968 $1,440,000
HO0077 #04 Y:1994 Air condition only space necessary $76,210 -