115
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | In vitro and in vivo diagnostic substances | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| IA0303 #09 Y:2002 | 09 | 2002 | Automate finishing process | $194,737 | $280,000 | |
| IA0303 #08 Y:2002 | 08 | 2002 | Install equipment to move product | $37,995 | $61,650 | |
| IA0303 #07 Y:2002 | 07 | 2002 | Install occupancy sensors | $138 | $200 | |
| IA0303 #06 Y:2002 | 06 | 2002 | Utilize higher efficiency lamps and/or ballasts | $3,059 | $10,890 | |
| IA0303 #05 Y:2002 | 05 | 2002 | Recover waste heat from equipment | $711 | $1,800 | |
| IA0303 #04 Y:2002 | 04 | 2002 | Install back-up equipment | $5,666 | $9,824 | |
| IA0303 #03 Y:2002 | 03 | 2002 | Reduce the pressure of compressed air to the minimum required | $246 | $15 | |
| IA0303 #02 Y:2002 | 02 | 2002 | Install compressor air intakes in coolest locations | $404 | $130 | |
| IA0303 #01 Y:2002 | 01 | 2002 | Eliminate leaks in inert gas and compressed air lines/ valves | $863 | $162 | |
| MA0477 #06 Y:2000 | 06 | 2000 | Install occupancy sensors | $410 | $500 | |
| MA0477 #05 Y:2000 | 05 | 2000 | Use adjustable frequency drive or multiple speed motors on existing system | $3,200 | $11,700 | |
| MA0477 #04 Y:2000 | 04 | 2000 | Reduce space conditioning during non-working hours | $3,910 | - | |
| MA0477 #03 Y:2000 | 03 | 2000 | Use cooling tower or economizer to replace chiller cooling | $6,580 | $21,000 | |
| MA0477 #02 Y:2000 | 02 | 2000 | Recover waste heat from equipment | $21,290 | $103,000 | |
| MA0477 #01 Y:2000 | 01 | 2000 | Chill water to the highest temperature possible | $22,890 | $2,000 | |
| SD0231 #03 Y:1999 | 03 | 1999 | Schedule deliveries according to demand | $7,020 | - | |
| SD0231 #02 Y:1999 | 02 | 1999 | Replace existing chiller with high efficiency model | $7,622 | $3,600 | |
| SD0231 #01 Y:1999 | 01 | 1999 | Utilize higher efficiency lamps and/or ballasts | $7,674 | $10,286 | |
| HO0077 #05 Y:1994 | 05 | 1994 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $221,968 | $1,440,000 | |
| HO0077 #04 Y:1994 | 04 | 1994 | Air condition only space necessary | $76,210 | - |