Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Pharmaceutical preparations
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UM0458 #01 Y:2015 Use outside cold water source as a supply of cooling water $7,036 -
UM0455 #06 Y:2015 Use waste heat from hot flue gases to preheat $11,725 $25,000
UM0455 #05 Y:2015 Use waste heat from hot flue gases to preheat $2,338 $2,500
UM0455 #04 Y:2015 Use cooling tower or economizer to replace chiller cooling $6,274 $7,300
UM0455 #03 Y:2015 Reduce the pressure of compressed air to the minimum required $3,898 $500
UM0455 #02 Y:2015 Install or upgrade insulation on hvac distribution systems $8,778 -
UM0455 #01 Y:2015 Install compressor air intakes in coolest locations $1,635 $2,000
UM0350 #08 Y:2008 Analyze flue gas for proper air/fuel ratio $649 $1,200
UM0350 #07 Y:2008 Insulate bare equipment $846 $474
UM0350 #06 Y:2008 Use waste heat from hot flue gases to preheat $8,186 $10,960
UM0350 #05 Y:2008 Reduce the pressure of compressed air to the minimum required $2,990 $100
UM0350 #04 Y:2008 Utilize higher efficiency lamps and/or ballasts $3,744 $30,000
UM0350 #03 Y:2008 Recover waste heat from equipment $7,300 $1,500
UM0350 #02 Y:2008 Recover waste heat from equipment $13,487 $13,000
UM0350 #01 Y:2008 Recycle air for heating, ventilation and air conditioning $14,346 $12,800
UM0190 #06 Y:2001 Install compressor air intakes in coolest locations $5,684 $1,000
UM0190 #05 Y:2001 Optimize plant power factor $20,286 $8,250
UM0190 #04 Y:2001 Make ice during off peak hours for cooling $293,000 $360,000
UM0190 #03 Y:2001 Lower temperature during the winter season and vice-versa $82,700 $8,000
UM0190 #02 Y:2001 Install occupancy sensors $20,468 $9,600