| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UM0458 #01 Y:2015 | 01 | 2015 | Use outside cold water source as a supply of cooling water | $7,036 | - | |
| UM0455 #06 Y:2015 | 06 | 2015 | Use waste heat from hot flue gases to preheat | $11,725 | $25,000 | |
| UM0455 #05 Y:2015 | 05 | 2015 | Use waste heat from hot flue gases to preheat | $2,338 | $2,500 | |
| UM0455 #04 Y:2015 | 04 | 2015 | Use cooling tower or economizer to replace chiller cooling | $6,274 | $7,300 | |
| UM0455 #03 Y:2015 | 03 | 2015 | Reduce the pressure of compressed air to the minimum required | $3,898 | $500 | |
| UM0455 #02 Y:2015 | 02 | 2015 | Install or upgrade insulation on hvac distribution systems | $8,778 | - | |
| UM0455 #01 Y:2015 | 01 | 2015 | Install compressor air intakes in coolest locations | $1,635 | $2,000 | |
| UM0350 #08 Y:2008 | 08 | 2008 | Analyze flue gas for proper air/fuel ratio | $649 | $1,200 | |
| UM0350 #07 Y:2008 | 07 | 2008 | Insulate bare equipment | $846 | $474 | |
| UM0350 #06 Y:2008 | 06 | 2008 | Use waste heat from hot flue gases to preheat | $8,186 | $10,960 | |
| UM0350 #05 Y:2008 | 05 | 2008 | Reduce the pressure of compressed air to the minimum required | $2,990 | $100 | |
| UM0350 #04 Y:2008 | 04 | 2008 | Utilize higher efficiency lamps and/or ballasts | $3,744 | $30,000 | |
| UM0350 #03 Y:2008 | 03 | 2008 | Recover waste heat from equipment | $7,300 | $1,500 | |
| UM0350 #02 Y:2008 | 02 | 2008 | Recover waste heat from equipment | $13,487 | $13,000 | |
| UM0350 #01 Y:2008 | 01 | 2008 | Recycle air for heating, ventilation and air conditioning | $14,346 | $12,800 | |
| UM0190 #06 Y:2001 | 06 | 2001 | Install compressor air intakes in coolest locations | $5,684 | $1,000 | |
| UM0190 #05 Y:2001 | 05 | 2001 | Optimize plant power factor | $20,286 | $8,250 | |
| UM0190 #04 Y:2001 | 04 | 2001 | Make ice during off peak hours for cooling | $293,000 | $360,000 | |
| UM0190 #03 Y:2001 | 03 | 2001 | Lower temperature during the winter season and vice-versa | $82,700 | $8,000 | |
| UM0190 #02 Y:2001 | 02 | 2001 | Install occupancy sensors | $20,468 | $9,600 |