Assessment Year | 2015 |
---|---|
Principal Product | Pharmaceutical Excipients |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
70,000
ft2
|
Annual Production | 5,000
ton
|
Production Hrs. Annual | 8,700
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $426,830 | 3,991,140 |
kWh
|
$0.11 |
Electricity Demand | $103,452 | 7,858 |
kW-mo/yr
|
$13.17 |
Natural Gas | $160,734 | 22,456 |
MMBtu
|
$7.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,648 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,510 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $1,635 | $2,000 |
$1,635
13,466
kWh
|
- | - | |
02 | 2.7212: Install or upgrade insulation on hvac distribution systems | $8,778 | - |
$8,778
82,040
kWh
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,898 | $500 |
$3,898
29,530
kWh
|
- | - | |
04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $6,274 | $7,300 |
$5,261
49,166
kWh
|
$1,013
-
kW-mo/yr
|
- | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $2,338 | $2,500 | - | - |
$2,338
-
MMBtu
|
|
06 | 2.2414: Use waste heat from hot flue gases to preheat | $11,725 | $25,000 | - | - |
$11,725
-
MMBtu
|
|
TOTAL RECOMMENDED | $34,648 | $37,300 |
$19,572
174,202
kWh
|
$1,013
-
kW-mo/yr
|
$14,063
-
MMBtu
|
||
TOTAL IMPLEMENTED | $12,510 | $10,300 |
$9,159
78,696
kWh
|
$1,013
-
kW-mo/yr
|
$2,338
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs