ITAC Assessment: UM0455
ITAC logo
ITAC Assessment: UM0455
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Pharmaceutical Excipients
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 70,000
ft2
Annual Production 5,000
ton
Production Hrs. Annual 8,700
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $426,830 3,991,140
kWh
Electricity Demand $103,452 7,858
kW-mo/yr
Natural Gas $160,734 22,456
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,648 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,510

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $1,635 $2,000 $1,635
13,466
kWh
- -
02 2.7212: Install or upgrade insulation on hvac distribution systems $8,778 - $8,778
82,040
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,898 $500 $3,898
29,530
kWh
- -
04 2.2614: Use cooling tower or economizer to replace chiller cooling $6,274 $7,300 $5,261
49,166
kWh
$1,013
-
kW-mo/yr
-
05 2.2414: Use waste heat from hot flue gases to preheat $2,338 $2,500 - - $2,338
-
MMBtu
06 2.2414: Use waste heat from hot flue gases to preheat $11,725 $25,000 - - $11,725
-
MMBtu
TOTAL RECOMMENDED $34,648 $37,300 $19,572
174,202
kWh
$1,013
-
kW-mo/yr
$14,063
-
MMBtu
TOTAL IMPLEMENTED $12,510 $10,300 $9,159
78,696
kWh
$1,013
-
kW-mo/yr
$2,338
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs