1,141
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Pharmaceutical preparations | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
SF0623 #05 Y:2024 | 05 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $1,720 | $4,257 |
n/a
|
SF0623 #04 Y:2024 | 04 | 2024 | Utilize higher efficiency lamps and/or ballasts | $2,599 | $3,962 |
n/a
|
SF0623 #03 Y:2024 | 03 | 2024 | Utilize controls to operate equipment only when needed | $2,887 | $1,146 |
n/a
|
SF0623 #02 Y:2024 | 02 | 2024 | Reduce ventilation air | $4,851 | - |
n/a
|
SF0623 #01 Y:2024 | 01 | 2024 | Turn off equipment when not in use | $4,288 | - |
n/a
|
MI0445 #08 Y:2024 | 08 | 2024 | Install occupancy sensors | $3,269 | $2,860 |
n/a
|
MI0445 #07 Y:2024 | 07 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $10,583 | $5,793 |
n/a
|
MI0445 #06 Y:2024 | 06 | 2024 | Change rate schedules or other changes in utility service | $19,584 | $150 |
n/a
|
MI0445 #05 Y:2024 | 05 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $32,574 | $11,027 |
n/a
|
MI0445 #04 Y:2024 | 04 | 2024 | Optimize plant power factor | $46,588 | $99,444 |
n/a
|
MI0445 #03 Y:2024 | 03 | 2024 | Pay utility bills on time | $80,165 | - |
n/a
|
MI0445 #02 Y:2024 | 02 | 2024 | Use most efficient type of electric motors | $217,248 | $42,472 |
n/a
|
MI0445 #01 Y:2024 | 01 | 2024 | Replace existing chiller with high efficiency model | $427,475 | $602,500 |
n/a
|
MI0443 #08 Y:2024 | 08 | 2024 | Install occupancy sensors | $1,287 | $501 |
n/a
|
MI0443 #07 Y:2024 | 07 | 2024 | Recharge batteries on during off-peak demand periods | $3,482 | $240 |
n/a
|
MI0443 #06 Y:2024 | 06 | 2024 | Use solar heat to heat water | $4,071 | $12,390 |
n/a
|
MI0443 #05 Y:2024 | 05 | 2024 | Clean or color roof to reduce solar load | $6,571 | $14,916 |
n/a
|
MI0443 #04 Y:2024 | 04 | 2024 | Replace obsolete burners with more efficient ones | $7,616 | $18,760 |
n/a
|
MI0443 #03 Y:2024 | 03 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,706 | $1,980 |
n/a
|
MI0443 #02 Y:2024 | 02 | 2024 | Replace existing chiller with high efficiency model | $14,162 | $54,938 |
n/a
|