Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cellulosic manmade fibers
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0559 #06 Y:2015 Use heat from boiler blowdown to preheat boiler feed water $9,950 $25,000
NC0559 #05 Y:2015 Flash condensate to produce lower pressure steam $20,410 $15,050
NC0559 #04 Y:2015 Use cooling tower or economizer to replace chiller cooling $5,720 $10,000
NC0559 #03 Y:2015 Replace high resistance ducts, pipes, and fittings $4,003 $1,000
NC0559 #02 Y:2015 Replace electric motors with back pressure steam turbines and use exhaust steam for process heat $28,202 $75,000
NC0559 #01 Y:2015 Change rate schedules or other changes in utility service $109,787 $1,000
OK0751 #03 Y:2007 Begin a practice of predictive / preventative maintenance $2,188 $200
OK0751 #02 Y:2007 Re-arrange equipment layout to reduce handling costs $59,692 $201,700
OK0751 #01 Y:2007 Recover waste heat from equipment $2,572 $2,401
UD0459 #05 Y:1995 Replace electrically-operated equipment with fossil fuel equipment $545,061 $4,500,000
UD0459 #04 Y:1995 Change procedures / equipment / operating conditions $41,743 $340,000
UD0459 #03 Y:1995 Utilize higher efficiency lamps and/or ballasts $1,174 $2,605
UD0459 #02 Y:1995 Increase amount of waste recovered for resale $9,913 $1,000
UD0459 #01 Y:1995 Optimize plant power factor $9,255 $3,200
NV0018 #06 Y:1994 Change rate schedules or other changes in utility service $10,300 -
NV0018 #05 Y:1994 Optimize plant power factor $437 $5,010
NV0018 #04 Y:1994 Shade windows from summer sun $103 $391
NV0018 #03 Y:1994 Install occupancy sensors $228 $135
NV0018 #02 Y:1994 Utilize higher efficiency lamps and/or ballasts $194 $186
NV0018 #01 Y:1994 Use most efficient type of electric motors $3,017 -