131
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Synthetic rubber (vulcanizable elastomers) | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
LS2417 #07 Y:2024 | 07 | 2024 | Use solar heat to make electricty | $63,875 | $514,800 |
n/a
|
LS2417 #06 Y:2024 | 06 | 2024 | Use most efficient type of electric motors | $33,694 | $120,300 |
n/a
|
LS2417 #05 Y:2024 | 05 | 2024 | Upgrade controls on compressors | $9,379 | $28,000 |
n/a
|
LS2417 #04 Y:2024 | 04 | 2024 | Replace fossil fuel equipment with electrical equipment | $182,554 | $481,830 |
n/a
|
LS2417 #03 Y:2024 | 03 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $82,069 | $99,800 |
n/a
|
LS2417 #02 Y:2024 | 02 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,173 | $90 |
n/a
|
LS2417 #01 Y:2024 | 01 | 2024 | Utilize daylight whenever possible in lieu of artificial light | $1,135 | $75 |
n/a
|
MS0431 #03 Y:2024 | 03 | 2024 | Use adsorption, ion exchange to remove contaminants | $2,111 | $124,000 |
n/a
|
MS0431 #02 Y:2024 | 02 | 2024 | Replace fossil fuel equipment with electrical equipment | $57,233 | $175,000 |
n/a
|
MS0431 #01 Y:2024 | 01 | 2024 | Use solar heat to make electricty | $60,065 | $1,274,840 |
n/a
|
GT0971 #06 Y:2023 | 06 | 2023 | Use solar heat to make electricty | $137,329 | $2,565,299 | |
GT0971 #05 Y:2023 | 05 | 2023 | Optimize plant power factor | $1,025 | $5,227 | |
GT0971 #04 Y:2023 | 04 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $13,705 | $17,982 | |
GT0971 #03 Y:2023 | 03 | 2023 | Turn off equipment when not in use | $4,632 | $867 | |
GT0971 #02 Y:2023 | 02 | 2023 | Chill water to the highest temperature possible | $3,384 | $400 | |
GT0971 #01 Y:2023 | 01 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $18,890 | $1,850 | |
NC0643 #05 Y:2019 | 05 | 2019 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $77,463 | $300,000 | |
NC0643 #04 Y:2019 | 04 | 2019 | Recover waste heat from equipment | $34,280 | $75,000 | |
NC0643 #03 Y:2019 | 03 | 2019 | Utilize a less expensive cooling method | $13,881 | $30,000 | |
NC0643 #02 Y:2019 | 02 | 2019 | Install smaller boiler (increase high fire duty cycle) | $9,495 | $1,000 |