Assessment Year | 2024 |
---|---|
Principal Product | Polybutadiene Resins |
NAICS | 325212: Synthetic Rubber Manufacturing |
SIC | 2822: Synthetic Rubber (Vulcanizable Elastomers) |
Sales Range | $1 M to 5M |
# of Employees | 30 |
Plant Area |
35,566
ft2
|
Annual Production | 1,825
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $63,494 | 1,325,059 |
kWh
|
$0.048 | |
Electricity Demand | $47,445 | 2,462 |
kW-mo/yr
|
$19.27 | |
Electricity Fees | $14,408 | - |
|
- | |
Natural Gas | $85,150 | 12,945 |
MMBtu
|
$6.58 | |
Waste Disposal Costs | |||||
Water Usage | $19,472 | 2,096 |
Tgal
|
$9.29 | |
TOTAL YEARLY COSTS | $229,969 | ||||
RECOMMENDED SAVINGS* | $10,313 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2622: Replace existing chiller with high efficiency model | $4,303 | $55,212 |
$2,197
45,847
kWh
|
$743
-
kW-mo/yr
|
$1,363
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,289 | $11,963 |
$1,052
21,955
kWh
|
$1,237
-
kW-mo/yr
|
- | - | |
03 | 2.4226: Use / purchase optimum sized compressor | $800 | $12,150 |
$235
4,894
kWh
|
$566
-
kW-mo/yr
|
- | - | |
04 | 2.2136: Install / repair insulation on steam lines | $204 | $796 |
$204
4,262
kWh
|
- | - | - | |
05 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $36 | $146 |
$6
119
kWh
|
- |
$30
-
MMBtu
|
- | |
06 | 2.2136: Install / repair insulation on steam lines | $155 | $428 | - | - |
$155
-
MMBtu
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,525 | $116 | - | - | - | $2,525 | |
TOTAL RECOMMENDED | $10,313 | $80,811 |
$3,693
77,077
kWh
|
$2,546
-
kW-mo/yr
|
$1,549
-
MMBtu
|
$2,525 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs