ITAC Assessment: CO0712
ITAC logo
ITAC Assessment: CO0712
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Molded Plastic Parts and Fabricated Metal Parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 52,535
ft2
Annual Production 192,000
lb
Production Hrs. Annual 3,822
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,313 1,527,937
kWh
Electricity Demand $110,737 5,273
kW-mo/yr
Electricity Fees $1,951 -
Natural Gas $15,096 1,947
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,370 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,140 $22,400 $5,490
134,800
kWh
$4,650
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,050 $1,000 $2,220
54,600
kWh
$1,830
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,180 $7,940 $590
14,500
kWh
$1,470
-
kW-mo/yr
$10 $110
TOTAL RECOMMENDED $16,370 $31,340 $8,300
203,900
kWh
$7,950
-
kW-mo/yr
$10 $110
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs