37
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Plastics materials, synthetic resins, and nonvulcanizable elastomers | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MZ0371 #04 Y:2025 | 04 | 2025 | Replace boiler | $383,764 | $475,000 | |
| MZ0371 #03 Y:2025 | 03 | 2025 | Use waste heat from hot flue gases to preheat incoming fluids | $1,555 | $5,880 | |
| MZ0371 #02 Y:2025 | 02 | 2025 | Use flue gases to heat process or service water | $1,063 | $3,900 | |
| MZ0371 #01 Y:2025 | 01 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $5,847 | $3,600 | |
| IC0322 #11 Y:2024 | 11 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $205 | $144 | |
| IC0322 #10 Y:2024 | 10 | 2024 | Eliminate or reduce compressed air usage | $1,536 | $2,000 | |
| IC0322 #09 Y:2024 | 09 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,919 | - | |
| IC0322 #08 Y:2024 | 08 | 2024 | Install timers and/or thermostats | $4,457 | $211 | |
| IC0322 #07 Y:2024 | 07 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $1,658 | $693 | |
| IC0322 #06 Y:2024 | 06 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $25,000 | $1,250 | |
| IC0322 #05 Y:2024 | 05 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $2,041 | $210 | |
| IC0322 #04 Y:2024 | 04 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $15,262 | $24,421 | |
| IC0322 #03 Y:2024 | 03 | 2024 | Increase amount of condensate returned | $36,404 | $43,673 | |
| IC0322 #02 Y:2024 | 02 | 2024 | Use waste heat from hot flue gases to preheat incoming fluids | $5,455 | $41,668 | |
| IC0322 #01 Y:2024 | 01 | 2024 | Replace obsolete burners with more efficient ones | $102,930 | $45,500 | |
| MZ0160 #10 Y:2014 | 10 | 2014 | Keep doors and windows shut when not on use | $11,172 | $24,000 | |
| MZ0160 #09 Y:2014 | 09 | 2014 | Lower temperature during the winter season and vice-versa | $6,495 | - | |
| MZ0160 #08 Y:2014 | 08 | 2014 | Install compressor air intakes in coolest locations | $13,300 | $5,000 | |
| MZ0160 #07 Y:2014 | 07 | 2014 | Recover waste heat from equipment | $3,778 | $7,000 | |
| MZ0160 #06 Y:2014 | 06 | 2014 | Eliminate/reduce an operation | $7,727 | - |