| Assessment Year | 2025 |
|---|---|
| Principal Product | solvent borne acrylic and polyester resins |
| NAICS | 325211: Plastics Material and Resin Manufacturing |
| SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
| Sales Range | $50 M to 100M |
| # of Employees | 75 |
| Plant Area |
16,000
ft2
|
| Annual Production | 23,000
ton
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $401,949 | 2,507,468 |
kWh
|
$0.16 | |
| Natural Gas | $206,670 | 64,118 |
MMBtu
|
$3.22 | |
| Waste Disposal Costs | |||||
| Water Usage | $83,098 | 10,535 |
Tgal
|
$7.89 | |
| TOTAL YEARLY COSTS | $691,717 | ||||
| RECOMMENDED SAVINGS* | $392,229 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,847 | $3,600 |
$5,847
36,318
kWh
|
- | - | |
| 02 | 2.2425: Use flue gases to heat process or service water | $1,063 | $3,900 | - |
$1,063
-
MMBtu
|
- | |
| 03 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $1,555 | $5,880 | - |
$1,555
-
MMBtu
|
- | |
| 04 | 2.1224: Replace boiler | $383,764 | $475,000 | - |
$8,764
-
MMBtu
|
$375,000 | |
| TOTAL RECOMMENDED | $392,229 | $488,380 |
$5,847
36,318
kWh
|
$11,382
-
MMBtu
|
$375,000 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs