ITAC Assessment: MZ0371
ITAC logo
ITAC Assessment: MZ0371
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product solvent borne acrylic and polyester resins
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $50
M
to 100
M
# of Employees 75
Plant Area 16,000
ft2
Annual Production 23,000
ton
Production Hrs. Annual 7,200
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $401,949 2,507,468
kWh
Natural Gas $206,670 64,118
MMBtu
Waste Disposal Costs
Water Usage $83,098 10,535
Tgal
TOTAL YEARLY COSTS $691,717
RECOMMENDED SAVINGS* $396,812 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Usage Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,847 $3,600 $5,847
36,318
kWh
- - -
02 3.4116: Meter recycled water (to reduce sewer charges) $4,583 $70,000 - - $4,583
-
Tgal
-
03 2.2425: Use flue gases to heat process or service water $1,063 $3,900 - $1,063
-
MMBtu
- -
04 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $1,555 $5,880 - $1,555
-
MMBtu
- -
05 2.1224: Replace boiler $383,764 $475,000 - $8,764
-
MMBtu
- $375,000
TOTAL RECOMMENDED $396,812 $558,380 $5,847
36,318
kWh
$11,382
-
MMBtu
$4,583
-
Tgal
$375,000
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs