matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UW2518 #06 Y:2025 | 06 | 2025 | Use or replace with energy efficient substitutes | $18,560 | $100,800 |
n/a
|
| UW2518 #05 Y:2025 | 05 | 2025 | Utilize higher efficiency lamps and/or ballasts | $4,286 | $28,047 |
n/a
|
| UW2518 #04 Y:2025 | 04 | 2025 | Use photocell controls | $795 | $1,729 |
n/a
|
| UW2518 #03 Y:2025 | 03 | 2025 | Install vinyl strip / high speed / air curtain doors | $13,675 | $64,800 |
n/a
|
| UW2518 #02 Y:2025 | 02 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $59,635 | $40,500 |
n/a
|
| UW2518 #01 Y:2025 | 01 | 2025 | Install back-up equipment | $172,619 | $196,087 |
n/a
|
| MI0468 #06 Y:2025 | 06 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $4,146 | $12,242 |
n/a
|
| MI0468 #05 Y:2025 | 05 | 2025 | Utilize higher efficiency lamps and/or ballasts | $4,443 | $4,136 |
n/a
|
| MI0468 #04 Y:2025 | 04 | 2025 | Install occupancy sensors | $3,143 | $1,775 |
n/a
|
| MI0468 #03 Y:2025 | 03 | 2025 | Use solar heat to make electricty | $96,937 | $3,200 |
n/a
|
| MI0468 #02 Y:2025 | 02 | 2025 | Lower temperature during the winter season and vice-versa | $15,745 | $240 |
n/a
|
| MI0468 #01 Y:2025 | 01 | 2025 | Reduce the pressure of compressed air to the minimum required | $120,439 | $200 |
n/a
|
| UL2505 #04 Y:2025 | 04 | 2025 | Use optimum thickness insulation | $23,183 | $32,000 |
n/a
|
| UL2505 #03 Y:2025 | 03 | 2025 | Recover waste heat from equipment | $14,289 | $39,000 |
n/a
|
| UL2505 #02 Y:2025 | 02 | 2025 | Use solar heat to make electricty | $16,332 | $130,462 |
n/a
|
| UL2505 #01 Y:2025 | 01 | 2025 | Install occupancy sensors | $188 | $393 |
n/a
|
| SD0672 #10 Y:2025 | 10 | 2025 | Replace water cooling on processes with air cooling | $43,311 | $4,700 |
n/a
|
| SD0672 #09 Y:2025 | 09 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $16,737 | $8,530 |
n/a
|
| SD0672 #08 Y:2025 | 08 | 2025 | Recover waste heat from equipment | $21,315 | $2,000 |
n/a
|
| SD0672 #07 Y:2025 | 07 | 2025 | Reschedule plant operations or reduce load to avoid peaks | $30,634 | - |
n/a
|