Assessment Year | 2025 |
---|---|
Principal Product | FD&C Colors and PVAP Excipient |
NAICS | 325130: Synthetic Dye and Pigment Manufacturing |
SIC | 2816: Inorganic Pigments |
Sales Range | $100 M to 500M |
# of Employees | 45 |
Plant Area |
116,595
ft2
|
Annual Production | 5,550
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $570,776 | 7,351,565 |
kWh
|
$0.078 |
Electricity Demand | $115,367 | 19,864 |
kW-mo/yr
|
$5.81 |
Electricity Fees | $175,339 | - |
|
- |
Natural Gas | $28,044 | 14,181 |
MMBtu
|
$1.98 |
TOTAL YEARLY COSTS | $889,526 | |||
RECOMMENDED SAVINGS* | $48,070 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,997 | - |
$1,747
22,402
kWh
|
$250
-
kW-mo/yr
|
- | |
02 | 2.7261: Install timers and/or thermostats | $16,130 | $280 |
$10,246
131,354
kWh
|
- |
$5,884
-
MMBtu
|
|
03 | 2.7135: Install occupancy sensors | $3,215 | $490 |
$3,215
39,686
kWh
|
- | - | |
04 | 2.4226: Use / purchase optimum sized compressor | $11,346 | $5,000 |
$8,360
107,169
kWh
|
$2,986
-
kW-mo/yr
|
- | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $2,192 | $1,500 |
$2,012
25,805
kWh
|
$180
-
kW-mo/yr
|
- | |
06 | 2.2443: Re-use or recycle hot or cold process exhaust air | $408 | $1,000 | - | - |
$408
-
MMBtu
|
|
07 | 2.2442: Preheat combustion air with waste heat | $1,873 | $5,000 |
$(-5,228.0)
(-67,033)
kWh
|
$(-157.0)
-
kW-mo/yr
|
$7,258
-
MMBtu
|
|
08 | 2.4221: Install compressor air intakes in coolest locations | $435 | $1,500 |
$389
4,992
kWh
|
$46
-
kW-mo/yr
|
- | |
09 | 2.7232: Replace existing hvac unit with high efficiency model | $8,717 | $32,299 |
$8,009
102,682
kWh
|
$708
-
kW-mo/yr
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,669 | $6,564 |
$1,460
18,720
kWh
|
$209
-
kW-mo/yr
|
- | |
11 | 2.7135: Install occupancy sensors | $88 | $400 |
$88
1,145
kWh
|
- | - | |
TOTAL RECOMMENDED | $48,070 | $54,033 |
$30,298
386,922
kWh
|
$4,222
-
kW-mo/yr
|
$13,550
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs