ITAC Assessment: SD0672
ITAC logo
ITAC Assessment: SD0672
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Sodium and Potassium Silicates
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 9
Plant Area 259,618
ft2
Annual Production 20,800
ton
Production Hrs. Annual 6,720
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $204,178 1,167,006
kWh
Electricity Demand $47,471 3,186
kW-mo/yr
Electricity Fees $8,025 -
Natural Gas $634,979 135,297
MMBtu
Waste Disposal Costs
Water Usage $64,369 6,949
Tgal
TOTAL YEARLY COSTS $959,022
RECOMMENDED SAVINGS* $181,947 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $24,489 $112,796 $17,999
102,850
kWh
$6,490
-
kW-mo/yr
- - -
02 2.3141: Use battery storage for demand control $18,727 $2,631 $3,524
(-20,138)
kWh
$15,202
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $565 $847 $490
2,803
kWh
$75
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $5,349 - $5,349
30,565
kWh
- - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,016 $8,765 $13,903
79,444
kWh
$2,114
-
kW-mo/yr
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,804 $3,518 $4,170
23,833
kWh
$634
-
kW-mo/yr
- - -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $30,634 - - - - - $30,634
08 2.2437: Recover waste heat from equipment $21,315 $2,000 - - $21,315
-
MMBtu
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,737 $8,530 $14,528
83,017
kWh
$2,209
-
kW-mo/yr
- - -
10 2.2437: Recover waste heat from equipment $43,311 $4,700 $(-1,517.1)
(-8,669)
kWh
$(-230.7)
-
kW-mo/yr
- $45,059
-
Tgal
-
TOTAL RECOMMENDED $181,947 $143,787 $58,446
293,705
kWh
$26,493
-
kW-mo/yr
$21,315
-
MMBtu
$45,059
-
Tgal
$30,634
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs