ITAC Assessment: UF0301
ITAC logo
ITAC Assessment: UF0301
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Orange Juice, Orange Juice Concentrate
NAICS
n/a
SIC 2087: Flavoring Extracts and Flavoring Syrups, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 31,000
ft2
Annual Production 4,000,000
pieces
Production Hrs. Annual 4,896
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $336,884 7,683,794
kWh
Electricity Demand $30,022 18,967
kW-mo/yr
Natural Gas $545,991 134,774
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $240,286 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.6218: Turn off equipment when not in use $1,016 - $1,016
23,242
kWh
- - - - -
02 2.7132: Install timers on light switches in little used areas $1,352 $134 $1,352
28,156
kWh
- - - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $809 - $809
16,857
kWh
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,526 $1,768 $2,322
52,779
kWh
$204
-
kW-mo/yr
- - - -
05 2.2424: Use heat in flue gases to preheat products or materials $51,092 $121,957 - - $51,092
-
MMBtu
- - -
06 2.4133: Use most efficient type of electric motors $16,517 $16,521 $15,178
344,963
kWh
$1,339
-
kW-mo/yr
- - - -
07 3.5311: Recover and reuse waste material $40,494 $1,035 - - - $40,494
-
gal
- -
08 4.231: Purchase equipment instead of leasing $70,176 - - - - - $70,176 -
09 4.425: Eliminate/reduce redundant inspections $56,304 $376 - - - - - $56,304
TOTAL RECOMMENDED $240,286 $141,791 $20,677
465,997
kWh
$1,543
-
kW-mo/yr
$51,092
-
MMBtu
$40,494
-
gal
$70,176 $56,304
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs