Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,212

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Chemicals and allied products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0632 #13 Y:2025 Level one – add communication using iiot devices to existing control system to modify operations $1,094 -
UF0632 #12 Y:2025 Level zero – install control systems for existing equipment $7,429 $20,000
UF0632 #11 Y:2025 Use reverse osmosis to concentrate material $3,839 $3,079
UF0632 #10 Y:2025 Install de-aerator in place of condensate tank $2,684 $2,743
UF0632 #09 Y:2025 Install turbulators $2,277 $3,750
UF0632 #08 Y:2025 Reduce the pressure of compressed air to the minimum required $4,170 $2,654
UF0632 #07 Y:2025 Minimize condenser cooling water temperature $4,170 $6,785
UF0632 #06 Y:2025 Improve combustion control capability $4,200 $2,000
UF0632 #05 Y:2025 Utilize controls to operate equipment only when needed $5,526 $20,560
UF0632 #04 Y:2025 Use waste heat from hot flue gases to preheat $12,726 $12,000
UF0632 #03 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $16,911 $34,076
UF0632 #02 Y:2025 Use demand controller or load shedder $21,772 $20,202
UF0632 #01 Y:2025 Use solar heat to make electricty $43,631 $322,608
UL2506 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $3,323 $17,116
UL2506 #05 Y:2025 Use solar heat to make electricty $13,709 $151,700
UL2506 #04 Y:2025 Optimize plant power factor $49,775 $25,480
UL2506 #03 Y:2025 Use outside cold water source as a supply of cooling water $43,343 $86,469
UL2506 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $4,455 $2,940
UL2506 #01 Y:2025 Use waste heat from hot flue gases to preheat $77,396 $40,000
WV0682 #15 Y:2025 Eliminate or reduce compressed air usage $1,069 $1,258