matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| KG0072 #08 Y:1996 | 08 | 1996 | Reduce scrap production | $21,888 | $2,000 | |
| KG0072 #07 Y:1996 | 07 | 1996 | Reschedule plant operations or reduce load to avoid peaks | $955 | - | |
| KG0072 #06 Y:1996 | 06 | 1996 | Install timers and/or thermostats | $966 | $150 | |
| KG0072 #05 Y:1996 | 05 | 1996 | Use most efficient type of electric motors | $1,255 | $1,900 | |
| KG0072 #04 Y:1996 | 04 | 1996 | Reduce the pressure of compressed air to the minimum required | $1,330 | $25 | |
| KG0072 #03 Y:1996 | 03 | 1996 | Recover heat from exhausted steam, hot air or hot water | $3,396 | $1,500 | |
| KG0072 #02 Y:1996 | 02 | 1996 | Lower temperature during the winter season and vice-versa | $3,206 | - | |
| KG0072 #01 Y:1996 | 01 | 1996 | Lower temperature during the winter season and vice-versa | $6,148 | - | |
| OD0072 #04 Y:1996 | 04 | 1996 | Use most efficient type of electric motors | $252 | $637 | |
| OD0072 #03 Y:1996 | 03 | 1996 | Utilize higher efficiency lamps and/or ballasts | $1,474 | $2,876 | |
| OD0072 #02 Y:1996 | 02 | 1996 | Install / repair insulation on steam lines | $7,269 | $4,887 | |
| OD0072 #01 Y:1996 | 01 | 1996 | Eliminate leaks in inert gas and compressed air lines/ valves | $134 | $200 | |
| MO0191 #07 Y:1996 | 07 | 1996 | Utilize higher efficiency lamps and/or ballasts | $120 | - | |
| MO0191 #06 Y:1996 | 06 | 1996 | Utilize higher efficiency lamps and/or ballasts | $1,556 | $1,410 | |
| MO0191 #05 Y:1996 | 05 | 1996 | Utilize higher efficiency lamps and/or ballasts | $2,274 | $5,576 | |
| MO0191 #04 Y:1996 | 04 | 1996 | Install compressor air intakes in coolest locations | $2,490 | $250 | |
| MO0191 #03 Y:1996 | 03 | 1996 | Reduce the pressure of compressed air to the minimum required | $2,247 | $80 | |
| MO0191 #02 Y:1996 | 02 | 1996 | Reduce / eliminate use of disposable product | $3,620 | $625 | |
| MO0191 #01 Y:1996 | 01 | 1996 | Install automatic packing equipment | $47,917 | $136,000 | |
| MO0190 #08 Y:1996 | 08 | 1996 | Consider use / purchase of bulk materials where possible | $58,733 | $15,000 |