Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,203

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Chemicals and allied products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
KG0072 #08 Y:1996 Reduce scrap production $21,888 $2,000
KG0072 #07 Y:1996 Reschedule plant operations or reduce load to avoid peaks $955 -
KG0072 #06 Y:1996 Install timers and/or thermostats $966 $150
KG0072 #05 Y:1996 Use most efficient type of electric motors $1,255 $1,900
KG0072 #04 Y:1996 Reduce the pressure of compressed air to the minimum required $1,330 $25
KG0072 #03 Y:1996 Recover heat from exhausted steam, hot air or hot water $3,396 $1,500
KG0072 #02 Y:1996 Lower temperature during the winter season and vice-versa $3,206 -
KG0072 #01 Y:1996 Lower temperature during the winter season and vice-versa $6,148 -
OD0072 #04 Y:1996 Use most efficient type of electric motors $252 $637
OD0072 #03 Y:1996 Utilize higher efficiency lamps and/or ballasts $1,474 $2,876
OD0072 #02 Y:1996 Install / repair insulation on steam lines $7,269 $4,887
OD0072 #01 Y:1996 Eliminate leaks in inert gas and compressed air lines/ valves $134 $200
MO0191 #07 Y:1996 Utilize higher efficiency lamps and/or ballasts $120 -
MO0191 #06 Y:1996 Utilize higher efficiency lamps and/or ballasts $1,556 $1,410
MO0191 #05 Y:1996 Utilize higher efficiency lamps and/or ballasts $2,274 $5,576
MO0191 #04 Y:1996 Install compressor air intakes in coolest locations $2,490 $250
MO0191 #03 Y:1996 Reduce the pressure of compressed air to the minimum required $2,247 $80
MO0191 #02 Y:1996 Reduce / eliminate use of disposable product $3,620 $625
MO0191 #01 Y:1996 Install automatic packing equipment $47,917 $136,000
MO0190 #08 Y:1996 Consider use / purchase of bulk materials where possible $58,733 $15,000