Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,197

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Chemicals and allied products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NV0074 #06 Y:1996 Recover heat from exhausted steam, hot air or hot water $12,900 $3,600
NV0074 #05 Y:1996 Use most efficient type of electric motors $387 $200
NV0074 #04 Y:1996 Eliminate leaks in inert gas and compressed air lines/ valves $1,545 $200
NV0074 #03 Y:1996 Turn off equipment when not in use $2,822 -
NV0074 #02 Y:1996 Utilize energy-efficient belts and other improved mechanisms $864 $200
NV0074 #01 Y:1996 Utilize higher efficiency lamps and/or ballasts $385 $225
GT0606 #08 Y:1996 Change procedures / equipment / operating conditions $3,074 $10,500
GT0606 #07 Y:1996 Install timers on light switches in little used areas $1,067 $350
GT0606 #06 Y:1996 Cover open tanks $7,420 $10,000
GT0606 #05 Y:1996 Analyze flue gas for proper air/fuel ratio $1,035 $450
GT0606 #04 Y:1996 Re-use or recycle hot or cold process exhaust air $32,500 $40,000
GT0606 #03 Y:1996 Isolate steam lines to avoid heating air conditioned areas $9,060 $1,000
GT0606 #02 Y:1996 Purchase gas directly from a contract gas supplier $88,813 $83,600
GT0606 #01 Y:1996 Change rate schedules or other changes in utility service $10,090 -
KG0072 #08 Y:1996 Reduce scrap production $21,888 $2,000
KG0072 #07 Y:1996 Reschedule plant operations or reduce load to avoid peaks $955 -
KG0072 #06 Y:1996 Install timers and/or thermostats $966 $150
KG0072 #05 Y:1996 Use most efficient type of electric motors $1,255 $1,900
KG0072 #04 Y:1996 Reduce the pressure of compressed air to the minimum required $1,330 $25
KG0072 #03 Y:1996 Recover heat from exhausted steam, hot air or hot water $3,396 $1,500