9,165
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0513 #03 Y:1996 | 03 | 1996 | Eliminate leaks in water lines and valves | $195,658 | $50,000 | |
| UD0513 #02 Y:1996 | 02 | 1996 | Recover and reuse cooling water | $82,538 | $50,000 | |
| UD0513 #01 Y:1996 | 01 | 1996 | Recover and reuse cooling water | $82,051 | $370,000 | |
| OR0288 #06 Y:1996 | 06 | 1996 | Utilize energy-efficient belts and other improved mechanisms | $2,100 | $9,050 | |
| OR0288 #05 Y:1996 | 05 | 1996 | Use most efficient type of electric motors | $390 | $1,390 | |
| OR0288 #04 Y:1996 | 04 | 1996 | Replace existing equipment with more suitable substitutes | $529,800 | $65,000 | |
| OR0288 #03 Y:1996 | 03 | 1996 | Modify refrigeration system to operate at a lower pressure | $5,140 | - | |
| OR0288 #02 Y:1996 | 02 | 1996 | Clean condenser tubes | $1,270 | $5,000 | |
| OR0288 #01 Y:1996 | 01 | 1996 | Replace hydraulic / pneumatic equipment with electric equipment | $6,130 | $32,400 | |
| UL0172 #08 Y:1996 | 08 | 1996 | Reuse / recycle/ sell paper products | $12,180 | - | |
| UL0172 #07 Y:1996 | 07 | 1996 | Use a less expensive method of waste removal | $22,850 | - | |
| UL0172 #06 Y:1996 | 06 | 1996 | Wash and reuse rags on-site | $1,860 | $4,500 | |
| UL0172 #05 Y:1996 | 05 | 1996 | Recover and reuse waste material | $16,140 | $9,500 | |
| UL0172 #04 Y:1996 | 04 | 1996 | Improve process control to prevent spills of material | $199,480 | $26,580 | |
| UL0172 #03 Y:1996 | 03 | 1996 | Use most efficient type of electric motors | $600 | $9,340 | |
| UL0172 #02 Y:1996 | 02 | 1996 | Utilize higher efficiency lamps and/or ballasts | $990 | $3,186 | |
| UL0172 #01 Y:1996 | 01 | 1996 | Analyze flue gas for proper air/fuel ratio | $195 | $500 | |
| UD0509 #10 Y:1996 | 10 | 1996 | Utilize higher efficiency lamps and/or ballasts | $1,492 | $3,080 | |
| UD0509 #09 Y:1996 | 09 | 1996 | Utilize higher efficiency lamps and/or ballasts | $512 | $1,600 | |
| UD0509 #08 Y:1996 | 08 | 1996 | Utilize higher efficiency lamps and/or ballasts | $1,559 | $3,600 |