ITAC Assessment: WV0116
ITAC logo
ITAC Assessment: WV0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Hydrocarbon Resin
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $100
M
to 500
M
# of Employees 330
Plant Area 1,950,000
ft2
Annual Production 70,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,035,910 44,621,630
kWh
Electricity Demand $638,645 78,074
kW-mo/yr
Electricity Fees $77,869 -
Natural Gas $712,382 146,775
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $227,209 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,853

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,254 $439 $126
4,982
kWh
$1,128
-
kW-mo/yr
- - - - -
02 2.4221: Install compressor air intakes in coolest locations $220 $600 $220
8,792
kWh
- - - - - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $4,312 $2,000 - - $4,312
-
MMBtu
- - - -
04 2.1213: Direct warmest air to combustion intake $4,636 $11,600 - - $4,636
-
MMBtu
- - - -
05 2.2511: Insulate bare equipment $262 $268 - - $262
-
MMBtu
- - - -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $2,025 - - - - - - $2,025 -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $25,500 $5,000 - - - $(-19,500.0) $45,000 - -
08 4.652: Replace existing equipment with more suitable substitutes $189,000 $2,360 - - - - - - $189,000
TOTAL RECOMMENDED $227,209 $22,267 $346
13,774
kWh
$1,128
-
kW-mo/yr
$9,210
-
MMBtu
$(-19,500.0) $45,000 $2,025 $189,000
TOTAL IMPLEMENTED $7,853 $2,707 $126
4,982
kWh
$1,128
-
kW-mo/yr
$4,574
-
MMBtu
- - $2,025 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings