Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,237

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Chemicals and allied products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NV0084 #11 Y:1997 Increase amount of waste recovered for resale $78 -
NV0084 #10 Y:1997 Regenerate cleaning solvent on-site and reuse $3,712 $5,025
NV0084 #09 Y:1997 Change procedures / equipment / operating conditions $920 $150
NV0084 #08 Y:1997 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $450 $690
NV0084 #07 Y:1997 Heat treat parts only to required specifications or standards $102 -
NV0084 #06 Y:1997 Use optimum temperature $195 -
NV0084 #05 Y:1997 Insulate bare equipment $431 $1,035
NV0084 #04 Y:1997 Use most efficient type of electric motors $258 $308
NV0084 #03 Y:1997 Install occupancy sensors $789 $410
NV0084 #02 Y:1997 Reduce illumination to minimum necessary levels $1,562 $375
NV0084 #01 Y:1997 Utilize higher efficiency lamps and/or ballasts $2,052 $840
WI0303 #05 Y:1997 Utilize energy-efficient belts and other improved mechanisms $696 -
WI0303 #04 Y:1997 Install compressor air intakes in coolest locations $1,329 $840
WI0303 #03 Y:1997 Analyze flue gas for proper air/fuel ratio $2,961 $500
WI0303 #02 Y:1997 Utilize higher efficiency lamps and/or ballasts $3,215 $3,484
WI0303 #01 Y:1997 Replace electrically-operated equipment with fossil fuel equipment $13,381 $15,000
CO0391 #06 Y:1997 Use filter and drying oven to reduce sludge volume $3,620 $23,500
CO0391 #05 Y:1997 Use / purchase optimum sized compressor $27,230 $27,230
CO0391 #04 Y:1997 Preheat combustion air with waste heat $430 $480
CO0391 #03 Y:1997 Utilize higher efficiency lamps and/or ballasts $1,479 $2,216