ITAC Assessment: NV0084
ITAC logo
ITAC Assessment: NV0084
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Ink
NAICS
n/a
SIC 2893: Printing Ink
Sales Range $10
M
to 50
M
# of Employees 32
Plant Area 30,000
ft2
Annual Production 638,000
lb
Production Hrs. Annual 2,730
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,621 765,240
kWh
Electricity Demand $33,292 3,648
kW-mo/yr
Electricity Fees $1,338 -
Natural Gas $12,139 2,427
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,692 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,946

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,052 $840 $1,072
24,326
kWh
$980
-
kW-mo/yr
- - - - - -
02 2.7111: Reduce illumination to minimum necessary levels $1,562 $375 $816
18,464
kWh
$746
-
kW-mo/yr
- - - - - -
03 2.7135: Install occupancy sensors $789 $410 $500
11,430
kWh
$289
-
kW-mo/yr
- - - - - -
04 2.4133: Use most efficient type of electric motors $258 $308 $113
2,638
kWh
$145
-
kW-mo/yr
- - - - - -
05 2.2511: Insulate bare equipment $431 $1,035 $431
25,498
kWh
- - - - - - -
06 2.2211: Use optimum temperature $195 - - - $195
-
MMBtu
- - - - -
07 2.2311: Heat treat parts only to required specifications or standards $102 - $10
293
kWh
$7
-
kW-mo/yr
$85
-
MMBtu
- - - - -
08 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $450 $690 $121
2,638
kWh
$110
-
kW-mo/yr
$219
-
MMBtu
- - - - -
09 3.1191: Change procedures / equipment / operating conditions $920 $150 $645
14,947
kWh
- $275
-
MMBtu
- - - - -
10 3.8141: Regenerate cleaning solvent on-site and reuse $3,712 $5,025 $(-18.0)
(-293)
kWh
- - - - $3,730
-
gal
- -
11 3.5313: Increase amount of waste recovered for resale $78 - - - - - - - $78
-
lb
-
12 2.3132: Recharge batteries on during off-peak demand periods $394 $147 - - - - - - - $394
13 3.4116: Meter recycled water (to reduce sewer charges) $437 $120 - - - $437
-
Tgal
- - - -
14 3.5313: Increase amount of waste recovered for resale $312 - - - - - $312
-
gal
- - -
TOTAL RECOMMENDED $11,692 $9,100 $3,690
99,941
kWh
$2,277
-
kW-mo/yr
$774
-
MMBtu
$437
-
Tgal
$312
-
gal
$3,730
-
gal
$78
-
lb
$394
TOTAL IMPLEMENTED $3,946 $2,675 $1,491
49,531
kWh
$1,008
-
kW-mo/yr
$304
-
MMBtu
$437
-
Tgal
$312
-
gal
- - $394
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs