| Assessment Year | 1983 |
|---|---|
| Principal Product | PLASTIC CONTAINERS |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
n/a
|
| Annual Production | 6,500,000
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $344,739 | 7,689,039 |
kWh
|
$0.045 |
| Natural Gas | $29,355 | 5,397 |
MMBtu
|
$5.44 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $29,840 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,421 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,239 | $1,310 |
$1,239
27,550
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,560 | $4,880 |
$2,560
57,151
kWh
|
- | |
| 03 | 2.3191: Use demand controller or load shedder | $9,340 | $9,000 |
$9,340
-
kWh
|
- | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,300 | $6,000 | - |
$3,300
-
MMBtu
|
|
| 05 | 2.4221: Install compressor air intakes in coolest locations | $1,130 | $1,000 |
$1,130
25,205
kWh
|
- | |
| 06 | 2.6212: Turn off equipment during breaks, reduce operating time | $9,421 | $12,000 |
$9,421
210,434
kWh
|
- | |
| 07 | 2.2511: Insulate bare equipment | $2,850 | $4,500 |
$2,850
64,478
kWh
|
- | |
| TOTAL RECOMMENDED | $29,840 | $38,690 |
$26,540
384,818
kWh
|
$3,300
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $9,421 | $12,000 |
$9,421
210,434
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs