ITAC Assessment: GT0196
ITAC logo
ITAC Assessment: GT0196
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product PLASTIC CONTAINERS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 6,500,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $344,739 7,689,039
kWh
Natural Gas $29,355 5,397
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,840 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,421

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,239 $1,310 $1,239
27,550
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,560 $4,880 $2,560
57,151
kWh
-
03 2.3191: Use demand controller or load shedder $9,340 $9,000 $9,340
-
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $3,300 $6,000 - $3,300
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $1,130 $1,000 $1,130
25,205
kWh
-
06 2.6212: Turn off equipment during breaks, reduce operating time $9,421 $12,000 $9,421
210,434
kWh
-
07 2.2511: Insulate bare equipment $2,850 $4,500 $2,850
64,478
kWh
-
TOTAL RECOMMENDED $29,840 $38,690 $26,540
384,818
kWh
$3,300
-
MMBtu
TOTAL IMPLEMENTED $9,421 $12,000 $9,421
210,434
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs