Assessment Year | 2012 |
---|---|
Principal Product | Rubber Trim |
NAICS | 326299: All Other Rubber Product Manufacturing |
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
50,000
ft2
|
Annual Production | 10,000,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $250,627 | 3,293,464 |
kWh
|
$0.076 |
Electricity Demand | $154,371 | 10,939 |
kW-mo/yr
|
$14.11 |
Electricity Fees | $24,407 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $86,117 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,084 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $48,105 | $79,350 |
$44,218
581,053
kWh
|
$19,676
-
kW-mo/yr
|
$(-15,789.0)
-
MMBtu
|
|
02 | 2.4239: Eliminate or reduce compressed air usage | $8,534 | $2,700 |
$5,483
72,055
kWh
|
$3,051
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,264 | $10,398 |
$4,668
61,345
kWh
|
$2,596
-
kW-mo/yr
|
- | |
04 | 2.7134: Use photocell controls | $5,372 | $4,900 |
$3,452
45,366
kWh
|
$1,920
-
kW-mo/yr
|
- | |
05 | 2.3132: Recharge batteries on during off-peak demand periods | $4,297 | $500 | - |
$4,297
-
kW-mo/yr
|
- | |
06 | 2.4322: Use or replace with energy efficient substitutes | $3,322 | $7,503 |
$1,952
25,645
kWh
|
$1,370
-
kW-mo/yr
|
- | |
07 | 2.4239: Eliminate or reduce compressed air usage | $2,827 | $200 |
$1,661
21,829
kWh
|
$1,166
-
kW-mo/yr
|
- | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,790 | $600 |
$1,640
21,550
kWh
|
$1,150
-
kW-mo/yr
|
- | |
09 | 2.7144: Install spectral reflectors / delamp | $2,556 | $7,320 |
$1,643
21,594
kWh
|
$913
-
kW-mo/yr
|
- | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,050 | $200 |
$1,050
13,792
kWh
|
- | - | |
TOTAL RECOMMENDED | $86,117 | $113,671 |
$65,767
864,229
kWh
|
$36,139
-
kW-mo/yr
|
$(-15,789.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $30,084 | $22,101 |
$16,454
216,216
kWh
|
$13,630
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs