ITAC Assessment: SD0456
ITAC logo
ITAC Assessment: SD0456
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Rubber Trim
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 50,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $250,627 3,293,464
kWh
Electricity Demand $154,371 10,939
kW-mo/yr
Electricity Fees $24,407 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,117 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,084

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $48,105 $79,350 $44,218
581,053
kWh
$19,676
-
kW-mo/yr
$(-15,789.0)
-
MMBtu
02 2.4239: Eliminate or reduce compressed air usage $8,534 $2,700 $5,483
72,055
kWh
$3,051
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,264 $10,398 $4,668
61,345
kWh
$2,596
-
kW-mo/yr
-
04 2.7134: Use photocell controls $5,372 $4,900 $3,452
45,366
kWh
$1,920
-
kW-mo/yr
-
05 2.3132: Recharge batteries on during off-peak demand periods $4,297 $500 - $4,297
-
kW-mo/yr
-
06 2.4322: Use or replace with energy efficient substitutes $3,322 $7,503 $1,952
25,645
kWh
$1,370
-
kW-mo/yr
-
07 2.4239: Eliminate or reduce compressed air usage $2,827 $200 $1,661
21,829
kWh
$1,166
-
kW-mo/yr
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,790 $600 $1,640
21,550
kWh
$1,150
-
kW-mo/yr
-
09 2.7144: Install spectral reflectors / delamp $2,556 $7,320 $1,643
21,594
kWh
$913
-
kW-mo/yr
-
10 2.4231: Reduce the pressure of compressed air to the minimum required $1,050 $200 $1,050
13,792
kWh
- -
TOTAL RECOMMENDED $86,117 $113,671 $65,767
864,229
kWh
$36,139
-
kW-mo/yr
$(-15,789.0)
-
MMBtu
TOTAL IMPLEMENTED $30,084 $22,101 $16,454
216,216
kWh
$13,630
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs