ITAC Assessment: IC0267
ITAC logo
ITAC Assessment: IC0267
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Medical Testing
NAICS 621511: Medical Laboratories
SIC 8071: Medical Laboratories
Sales Range less than $500
k
# of Employees 400
Plant Area 180,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $518,347 5,286,674
kWh
Natural Gas $109,847 17,066
MMBtu
TOTAL YEARLY COSTS $628,194
RECOMMENDED SAVINGS* $58,734 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,543

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $34,764 $12,282 $34,764
354,738
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,427 $97 $5,427
55,381
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $18,543 $7,600 $18,543
189,216
kWh
TOTAL RECOMMENDED $58,734 $19,979 $58,734
599,335
kWh
TOTAL IMPLEMENTED $18,543 $7,600 $18,543
189,216
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs