ITAC Assessment: CO0391
ITAC logo
ITAC Assessment: CO0391
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product specialty metals & metal oxides
NAICS
n/a
SIC 2816: Inorganic Pigments
Sales Range $10
M
to 50
M
# of Employees 31
Plant Area 27,550
ft2
Annual Production 2,400,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,499 2,519,344
kWh
Electricity Demand $69,964 5,262
kW-mo/yr
Electricity Fees $981 -
Natural Gas $123,582 35,571
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,191 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,141

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,130 $3,710 $980
56,565
kWh
$1,150
-
kW-mo/yr
- - - -
02 2.4133: Use most efficient type of electric motors $302 $403 $145
8,499
kWh
$157
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,479 $2,216 $553
31,946
kWh
$926
-
kW-mo/yr
- - - -
04 2.2442: Preheat combustion air with waste heat $430 $480 - - $430
-
MMBtu
- - -
05 2.4226: Use / purchase optimum sized compressor $27,230 $27,230 $9,280
537,515
kWh
$13,650
-
kW-mo/yr
- $400
-
gal
- $3,900
06 3.6112: Use filter and drying oven to reduce sludge volume $3,620 $23,500 $(-650.0)
(-37,515)
kWh
- - - $4,270
-
lb
-
TOTAL RECOMMENDED $35,191 $57,539 $10,308
597,010
kWh
$15,883
-
kW-mo/yr
$430
-
MMBtu
$400
-
gal
$4,270
-
lb
$3,900
TOTAL IMPLEMENTED $31,141 $33,559 $10,958
634,525
kWh
$15,883
-
kW-mo/yr
- $400
-
gal
- $3,900
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs