Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

766

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Chemicals and allied products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0898 #02 Y:2013 Reduce space conditioning during non-working hours $11,196 $300
UD0898 #01 Y:2013 Utilize energy-efficient belts and other improved mechanisms $156 $50
UD0887 #13 Y:2013 Turn off equipment when not in use $383 -
UD0887 #12 Y:2013 Utilize energy-efficient belts and other improved mechanisms $500 -
UD0887 #11 Y:2013 Develop a repair/replace policy $2,637 $3,420
UD0887 #10 Y:2013 Use heat in flue gases to preheat products or materials $187 $300
UD0887 #09 Y:2013 Analyze flue gas for proper air/fuel ratio $5,136 $4,000
UD0887 #08 Y:2013 Reschedule plant operations or reduce load to avoid peaks $10,244 -
UD0887 #07 Y:2013 Optimize plant power factor $19,173 $10,000
UD0887 #06 Y:2013 Add area lighting switches $594 $350
UD0887 #05 Y:2013 Add area lighting switches $3,141 $350
UD0887 #04 Y:2013 Install spectral reflectors / delamp $8,763 $2,075
UD0887 #03 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $497 $500
UD0887 #02 Y:2013 Remove or close off unneeded compressed air lines $1,438 -
UD0887 #01 Y:2013 Reduce the pressure of compressed air to the minimum required $1,553 $50
UD0886 #16 Y:2013 Reduce ventilation air $32,467 $20,000
UD0886 #15 Y:2013 Replace city water with recycled water via cooling tower $9,716 $30,000
UD0886 #14 Y:2013 Install smaller boiler (increase high fire duty cycle) $2,995 -
UD0886 #13 Y:2013 Analyze flue gas for proper air/fuel ratio $3,167 -
UD0886 #12 Y:2013 Insulate glazing, walls, ceilings, and roofs $3,648 $6,720