Assessment Year | 2013 |
---|---|
Principal Product | Polyurethane Sealants and Coatings |
NAICS | 325510: Paint and Coating Manufacturing |
SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
Sales Range | $50 M to 100M |
# of Employees | 75 |
Plant Area |
150,000
ft2
|
Annual Production | 2,300
Tgal
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $328,346 | 5,173,640 |
kWh
|
$0.063 |
Electricity Demand | $130,354 | 12,900 |
kW-mo/yr
|
$10.10 |
Electricity Fees | $3,250 | - |
|
- |
Natural Gas | $153,195 | 32,887 |
MMBtu
|
$4.66 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $185,151 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,712 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 3.4151: Minimize water usage | $32,244 | $1,000 |
$1,354
21,347
kWh
|
- | - |
$19,675
-
Tgal
|
$11,215
-
gal
|
- | - | |
02 | 3.4116: Meter recycled water (to reduce sewer charges) | $4,317 | $1,000 | - | - | - |
$4,317
-
Tgal
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,238 | $7,500 |
$4,974
70,408
kWh
|
- | - | - | - | $264 | - | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $20,782 | $50,000 |
$20,782
348,755
kWh
|
- | - | - | - | - | - | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $7,028 | - |
$7,028
110,781
kWh
|
- | - | - | - | - | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,761 | - | - |
$5,761
-
kW-mo/yr
|
- | - | - | - | - | |
07 | 2.4113: Install motor voltage controller on lightly loaded motors | $36,728 | $14,900 |
$28,477
448,889
kWh
|
$8,251
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 2.4113: Install motor voltage controller on lightly loaded motors | $4,035 | $3,550 |
$4,035
63,597
kWh
|
- | - | - | - | - | - | |
09 | 2.4224: Upgrade controls on compressors | $16,109 | $27,000 |
$16,109
253,918
kWh
|
- | - | - | - | - | - | |
10 | 2.4239: Eliminate or reduce compressed air usage | $575 | $1,000 |
$446
7,034
kWh
|
$129
-
kW-mo/yr
|
- | - | - | - | - | |
11 | 2.1233: Analyze flue gas for proper air/fuel ratio | $341 | - | - | - |
$341
-
MMBtu
|
- | - | - | - | |
12 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $3,648 | $6,720 | - | - |
$3,648
-
MMBtu
|
- | - | - | - | |
13 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,167 | - | - | - |
$3,167
-
MMBtu
|
- | - | - | - | |
14 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $2,995 | - | - | - |
$2,995
-
MMBtu
|
- | - | - | - | |
15 | 3.4114: Replace city water with recycled water via cooling tower | $9,716 | $30,000 |
$(-1,062.0)
(-16,739)
kWh
|
- | - |
$8,432
-
Tgal
|
- | - |
$2,346
-
Tgal
|
|
16 | 2.7314: Reduce ventilation air | $32,467 | $20,000 |
$13,015
205,150
kWh
|
- |
$19,452
-
MMBtu
|
- | - | - | - | |
TOTAL RECOMMENDED | $185,151 | $162,670 |
$95,158
1,513,140
kWh
|
$14,141
-
kW-mo/yr
|
$29,603
-
MMBtu
|
$32,424
-
Tgal
|
$11,215
-
gal
|
$264 |
$2,346
-
Tgal
|
||
TOTAL IMPLEMENTED | $43,712 | $21,620 |
$28,477
448,889
kWh
|
$8,251
-
kW-mo/yr
|
$6,984
-
MMBtu
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs