ITAC Assessment: UD0886
ITAC logo
ITAC Assessment: UD0886
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Polyurethane Sealants and Coatings
NAICS 325510: Paint and Coating Manufacturing
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $50
M
to 100
M
# of Employees 75
Plant Area 150,000
ft2
Annual Production 2,300
Tgal
Production Hrs. Annual 6,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $328,346 5,173,640
kWh
Electricity Demand $130,354 12,900
kW-mo/yr
Electricity Fees $3,250 -
Natural Gas $153,195 32,887
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $185,151 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,712

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Administrative Changes Savings Water Consumption Savings
01 3.4151: Minimize water usage $32,244 $1,000 $1,354
21,347
kWh
- - $19,675
-
Tgal
$11,215
-
gal
- -
02 3.4116: Meter recycled water (to reduce sewer charges) $4,317 $1,000 - - - $4,317
-
Tgal
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,238 $7,500 $4,974
70,408
kWh
- - - - $264 -
04 2.6212: Turn off equipment during breaks, reduce operating time $20,782 $50,000 $20,782
348,755
kWh
- - - - - -
05 2.6212: Turn off equipment during breaks, reduce operating time $7,028 - $7,028
110,781
kWh
- - - - - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,761 - - $5,761
-
kW-mo/yr
- - - - -
07 2.4113: Install motor voltage controller on lightly loaded motors $36,728 $14,900 $28,477
448,889
kWh
$8,251
-
kW-mo/yr
- - - - -
08 2.4113: Install motor voltage controller on lightly loaded motors $4,035 $3,550 $4,035
63,597
kWh
- - - - - -
09 2.4224: Upgrade controls on compressors $16,109 $27,000 $16,109
253,918
kWh
- - - - - -
10 2.4239: Eliminate or reduce compressed air usage $575 $1,000 $446
7,034
kWh
$129
-
kW-mo/yr
- - - - -
11 2.1233: Analyze flue gas for proper air/fuel ratio $341 - - - $341
-
MMBtu
- - - -
12 2.7491: Insulate glazing, walls, ceilings, and roofs $3,648 $6,720 - - $3,648
-
MMBtu
- - - -
13 2.1233: Analyze flue gas for proper air/fuel ratio $3,167 - - - $3,167
-
MMBtu
- - - -
14 2.1223: Install smaller boiler (increase high fire duty cycle) $2,995 - - - $2,995
-
MMBtu
- - - -
15 3.4114: Replace city water with recycled water via cooling tower $9,716 $30,000 $(-1,062.0)
(-16,739)
kWh
- - $8,432
-
Tgal
- - $2,346
-
Tgal
16 2.7314: Reduce ventilation air $32,467 $20,000 $13,015
205,150
kWh
- $19,452
-
MMBtu
- - - -
TOTAL RECOMMENDED $185,151 $162,670 $95,158
1,513,140
kWh
$14,141
-
kW-mo/yr
$29,603
-
MMBtu
$32,424
-
Tgal
$11,215
-
gal
$264 $2,346
-
Tgal
TOTAL IMPLEMENTED $43,712 $21,620 $28,477
448,889
kWh
$8,251
-
kW-mo/yr
$6,984
-
MMBtu
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs