Assessment Year | 2013 |
---|---|
Principal Product | Gas Station Equipment |
NAICS | 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 120 |
Plant Area |
189,000
ft2
|
Annual Production | 2,000,000
pieces
|
Production Hrs. Annual | 4,500
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $191,329 | 4,469,271 |
kWh
|
$0.043 |
Electricity Demand | $195,615 | 10,620 |
kW-mo/yr
|
$18.42 |
Natural Gas | $61,717 | 10,076 |
MMBtu
|
$6.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $54,246 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,865 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,553 | $50 |
$743
18,450
kWh
|
$810
-
kW-mo/yr
|
- | - | |
02 | 2.4235: Remove or close off unneeded compressed air lines | $1,438 | - |
$688
17,079
kWh
|
$750
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $497 | $500 |
$238
5,895
kWh
|
$259
-
kW-mo/yr
|
- | - | |
04 | 2.7144: Install spectral reflectors / delamp | $8,763 | $2,075 |
$4,161
103,265
kWh
|
$3,780
-
kW-mo/yr
|
- | $822 | |
05 | 2.7131: Add area lighting switches | $3,141 | $350 |
$2,878
71,442
kWh
|
- | - | $263 | |
06 | 2.7131: Add area lighting switches | $594 | $350 |
$594
14,749
kWh
|
- | - | - | |
07 | 2.3212: Optimize plant power factor | $19,173 | $10,000 | - |
$19,173
-
kW-mo/yr
|
- | - | |
08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $10,244 | - | - |
$10,244
-
kW-mo/yr
|
- | - | |
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,136 | $4,000 | - | - |
$5,136
-
MMBtu
|
- | |
10 | 2.2424: Use heat in flue gases to preheat products or materials | $187 | $300 | - | - |
$187
-
MMBtu
|
- | |
11 | 2.4151: Develop a repair/replace policy | $2,637 | $3,420 |
$1,075
26,676
kWh
|
$1,562
-
kW-mo/yr
|
- | - | |
12 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $500 | - |
$108
2,679
kWh
|
$392
-
kW-mo/yr
|
- | - | |
13 | 2.6218: Turn off equipment when not in use | $383 | - |
$383
9,512
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $54,246 | $21,045 |
$10,868
269,747
kWh
|
$36,970
-
kW-mo/yr
|
$5,323
-
MMBtu
|
$1,085 | ||
TOTAL IMPLEMENTED | $15,865 | $6,395 |
$7,882
195,626
kWh
|
$7,161
-
kW-mo/yr
|
- | $822 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs