ITAC Assessment: UD0898
ITAC logo
ITAC Assessment: UD0898
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Coatings/ Asphalt
NAICS 325510: Paint and Coating Manufacturing
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $50
M
to 100
M
# of Employees 26
Plant Area 50,000
ft2
Annual Production 5,000
Tgal
Production Hrs. Annual 3,300
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,645 1,473,862
kWh
Electricity Demand $44,942 5,148
kW-mo/yr
Natural Gas $46,173 8,958
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,992 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,143

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $156 $50 $126
1,878
kWh
$30
-
kW-mo/yr
- -
02 2.7224: Reduce space conditioning during non-working hours $11,196 $300 - - $11,196
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $778 - - - $778
-
MMBtu
-
04 2.2514: Cover open tanks $57 $200 - - $57
-
MMBtu
-
05 2.4113: Install motor voltage controller on lightly loaded motors $8,127 $6,567 $4,546
67,916
kWh
$1,423
-
kW-mo/yr
$2,158
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,748 $2,320 $1,108
16,554
kWh
$482
-
kW-mo/yr
- $158
07 2.4231: Reduce the pressure of compressed air to the minimum required $621 $20 $621
9,282
kWh
- - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $309 - $517
7,718
kWh
$92
-
kW-mo/yr
- $(-300.0)
TOTAL RECOMMENDED $22,992 $9,457 $6,918
103,348
kWh
$2,027
-
kW-mo/yr
$14,189
-
MMBtu
$(-142.0)
TOTAL IMPLEMENTED $1,143 $270 $1,264
18,878
kWh
$122
-
kW-mo/yr
$57
-
MMBtu
$(-300.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs