ITAC Assessment: UF0151
ITAC logo
ITAC Assessment: UF0151
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Bottles
NAICS
n/a
SIC 2842: Specialty Cleaning, Polishing, and Sanitation Preparations
Sales Range $5
M
to 10
M
# of Employees 28
Plant Area 34,000
ft2
Annual Production 34,543,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $250,505 4,092,614
kWh
Electricity Demand $44,644 9,815
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,106 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,600

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,041 $3,571 $1,811
29,601
kWh
$230
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $980 $684 $896
14,654
kWh
$84
-
kW-mo/yr
03 2.4133: Use most efficient type of electric motors $4,485 $5,221 $3,726
60,961
kWh
$759
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,600 $700 $1,600
22,274
kWh
-
TOTAL RECOMMENDED $9,106 $10,176 $8,033
127,490
kWh
$1,073
-
kW-mo/yr
TOTAL IMPLEMENTED $1,600 $700 $1,600
22,274
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs