Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

190

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Blankbooks, looseleaf binders, and bookbinding
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0425 #08 Y:2016 Utilize higher efficiency lamps and/or ballasts $5,941 $13,422
SU0425 #07 Y:2016 Install compressor air intakes in coolest locations $1,298 $2,828
SU0425 #06 Y:2016 Use or replace with energy efficient substitutes $2,344 $4,750
SU0425 #05 Y:2016 Utilize higher efficiency lamps and/or ballasts $506 $396
SU0425 #04 Y:2016 Reduce ventilation air $5,242 $3,294
SU0425 #03 Y:2016 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $1,946 $852
SU0425 #02 Y:2016 Disconnect ballasts $204 -
SU0425 #01 Y:2016 Apply for tax-free status for energy purchases $5,154 -
BD0318 #07 Y:2006 Install / repair insulation on steam lines $319 $480
BD0318 #06 Y:2006 Install compressor air intakes in coolest locations $301 $600
BD0318 #05 Y:2006 Reduce the pressure of compressed air to the minimum required $1,077 $1,077
BD0318 #04 Y:2006 Recover waste heat from equipment $6,945 $1,200
BD0318 #03 Y:2006 Install occupancy sensors $304 $675
BD0318 #02 Y:2006 Reduce illumination to minimum necessary levels $10,326 $1,140
BD0318 #01 Y:2006 Automate payroll system $15,000 $10,500
MS0306 #05 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $948 $4,566
MS0306 #04 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $2,093 $180
MS0306 #03 Y:2006 Utilize energy-efficient belts and other improved mechanisms $4,662 $2,550
MS0306 #02 Y:2006 Utilize higher efficiency lamps and/or ballasts $9,063 $89,988
MS0306 #01 Y:2006 Utilize higher efficiency lamps and/or ballasts $26,113 $36,171