ITAC Assessment: MS0306
ITAC logo
ITAC Assessment: MS0306
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Note Pads
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2782: Blankbooks, Looseleaf Binders and Devices
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 235,000
ft2
Annual Production 35,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,911,185 5,400,000
kWh
Electricity Demand $115,337 11,257
kW-mo/yr
Electricity Fees $7,634 -
Natural Gas $60,365 4,484
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,879 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,755

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $26,113 $36,171 $16,836
411,441
kWh
$8,891
-
kW-mo/yr
$386
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,063 $89,988 $5,524
134,894
kWh
$3,406
-
kW-mo/yr
$133
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,662 $2,550 $2,232
54,553
kWh
$2,360
-
kW-mo/yr
$70
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,093 $180 $2,062
50,401
kWh
- $31
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $948 $4,566 $934
22,826
kWh
- $14
TOTAL RECOMMENDED $42,879 $133,455 $27,588
674,115
kWh
$14,657
-
kW-mo/yr
$634
TOTAL IMPLEMENTED $6,755 $2,730 $4,294
104,954
kWh
$2,360
-
kW-mo/yr
$101
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs