ITAC Assessment: WV0033
ITAC logo
ITAC Assessment: WV0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Lumber Products
NAICS
n/a
SIC 2431: Millwork
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 100,000
ft2
Annual Production 3,000
thousand feet
Production Hrs. Annual 3,120
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,965 1,104,631
kWh
Natural Gas $64,787 12,422
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,680 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,583

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $28 $6,825 $28
586
kWh
-
02 2.4133: Use most efficient type of electric motors $225 $11,930 $225
5,275
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,663 $3,000 - $1,663
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $17,550 $800 - $17,550
-
MMBtu
05 2.1213: Direct warmest air to combustion intake $11,743 $3,420 - $11,743
-
MMBtu
06 2.2136: Install / repair insulation on steam lines $9,552 $1,421 - $9,552
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $400 $368 $400
15,533
kWh
-
08 2.7124: Make a practice of turning off lights when not needed $189 - $189
4,396
kWh
-
09 2.4314: Use synthetic lubricant $150 - $150
3,517
kWh
-
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,138 $3,250 $1,138
26,671
kWh
-
11 2.7447: Install vinyl strip / high speed / air curtain doors $1,042 $362 - $1,042
-
MMBtu
TOTAL RECOMMENDED $43,680 $31,376 $2,130
55,978
kWh
$41,550
-
MMBtu
TOTAL IMPLEMENTED $2,583 $22,367 $1,541
36,049
kWh
$1,042
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs