| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OK0537 #07 Y:1997 | 07 | 1997 | Recycle waste ink and cleanup solvent | $500 | $1,300 | |
| OK0537 #06 Y:1997 | 06 | 1997 | Contract a wood pallet recycling company | $4,000 | - | |
| OK0537 #05 Y:1997 | 05 | 1997 | Utilize higher efficiency lamps and/or ballasts | $793 | $1,000 | |
| OK0537 #04 Y:1997 | 04 | 1997 | Regrind, reuse, or sell scrap plastic parts | $33,000 | $65,000 | |
| OK0537 #03 Y:1997 | 03 | 1997 | Reduce the pressure of compressed air to the minimum required | $503 | - | |
| OK0537 #02 Y:1997 | 02 | 1997 | Recover waste heat from equipment | $553 | $1,065 | |
| OK0537 #01 Y:1997 | 01 | 1997 | Install set-back timers | $676 | $780 | |
| OK0478 #11 Y:1995 | 11 | 1995 | Use a less expensive method of waste removal | $4,300 | - | |
| OK0478 #10 Y:1995 | 10 | 1995 | Minimize contamination of water before treatment | $6,080 | $500 | |
| OK0478 #09 Y:1995 | 09 | 1995 | Switch to a solvent that can be cleaned and re-used | $8,089 | $4,295 | |
| OK0478 #08 Y:1995 | 08 | 1995 | Recharge batteries on during off-peak demand periods | $1,578 | $1,000 | |
| OK0478 #07 Y:1995 | 07 | 1995 | Install timers on light switches in little used areas | $2,143 | $1,000 | |
| OK0478 #06 Y:1995 | 06 | 1995 | Install compressor air intakes in coolest locations | $2,382 | $1,650 | |
| OK0478 #05 Y:1995 | 05 | 1995 | Install spectral reflectors / delamp | $2,792 | $160 | |
| OK0478 #04 Y:1995 | 04 | 1995 | Reduce illumination to minimum necessary levels | $3,490 | $2,500 | |
| OK0478 #03 Y:1995 | 03 | 1995 | Utilize controls to operate equipment only when needed | $5,482 | $2,520 | |
| OK0478 #02 Y:1995 | 02 | 1995 | Replace electrically-operated equipment with fossil fuel equipment | $28,374 | $48,000 | |
| OK0478 #01 Y:1995 | 01 | 1995 | Use cooling tower water instead of refrigeration | $63,653 | $25,000 | |
| OK0070 #08 Y:1982 | 08 | 1982 | Use waste heat from hot flue gases to preheat | $9,064 | $53,000 | |
| OK0070 #07 Y:1982 | 07 | 1982 | Optimize plant power factor | $1,612 | $2,173 |