Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Commercial printing, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0537 #07 Y:1997 Recycle waste ink and cleanup solvent $500 $1,300
OK0537 #06 Y:1997 Contract a wood pallet recycling company $4,000 -
OK0537 #05 Y:1997 Utilize higher efficiency lamps and/or ballasts $793 $1,000
OK0537 #04 Y:1997 Regrind, reuse, or sell scrap plastic parts $33,000 $65,000
OK0537 #03 Y:1997 Reduce the pressure of compressed air to the minimum required $503 -
OK0537 #02 Y:1997 Recover waste heat from equipment $553 $1,065
OK0537 #01 Y:1997 Install set-back timers $676 $780
OK0478 #11 Y:1995 Use a less expensive method of waste removal $4,300 -
OK0478 #10 Y:1995 Minimize contamination of water before treatment $6,080 $500
OK0478 #09 Y:1995 Switch to a solvent that can be cleaned and re-used $8,089 $4,295
OK0478 #08 Y:1995 Recharge batteries on during off-peak demand periods $1,578 $1,000
OK0478 #07 Y:1995 Install timers on light switches in little used areas $2,143 $1,000
OK0478 #06 Y:1995 Install compressor air intakes in coolest locations $2,382 $1,650
OK0478 #05 Y:1995 Install spectral reflectors / delamp $2,792 $160
OK0478 #04 Y:1995 Reduce illumination to minimum necessary levels $3,490 $2,500
OK0478 #03 Y:1995 Utilize controls to operate equipment only when needed $5,482 $2,520
OK0478 #02 Y:1995 Replace electrically-operated equipment with fossil fuel equipment $28,374 $48,000
OK0478 #01 Y:1995 Use cooling tower water instead of refrigeration $63,653 $25,000
OK0070 #08 Y:1982 Use waste heat from hot flue gases to preheat $9,064 $53,000
OK0070 #07 Y:1982 Optimize plant power factor $1,612 $2,173