ITAC Assessment: OK0537
ITAC logo
ITAC Assessment: OK0537
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Office forms
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 100,000
ft2
Annual Production 2,000
ton
Production Hrs. Annual 7,488
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $112,250 2,446,073
kWh
Electricity Fees $2,100 -
Natural Gas $18,484 3,142
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,025 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,293

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.6232: Install set-back timers $676 $780 - $676
-
MMBtu
- - - -
02 2.2437: Recover waste heat from equipment $553 $1,065 - $553
-
MMBtu
- - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $503 - $503
7,034
kWh
- - - - -
04 3.5212: Regrind, reuse, or sell scrap plastic parts $33,000 $65,000 - - - $48,000
-
lb
$(-15,000.0) -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $793 $1,000 $599
8,206
kWh
- - - $194 -
06 3.5316: Contract a wood pallet recycling company $4,000 - - - - $4,000
-
lb
- -
07 3.5121: Recycle waste ink and cleanup solvent $500 $1,300 - - $6,000
-
gal
- - $(-5,500.0)
TOTAL RECOMMENDED $40,025 $69,145 $1,102
15,240
kWh
$1,229
-
MMBtu
$6,000
-
gal
$52,000
-
lb
$(-14,806.0) $(-5,500.0)
TOTAL IMPLEMENTED $34,293 $67,300 $599
8,206
kWh
- $6,000
-
gal
$48,000
-
lb
$(-14,806.0) $(-5,500.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs