Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

176

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Commercial printing, gravure
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0750 #10 Y:2007 Replace existing equipment with more suitable substitutes $4,150,588 $195,000
OK0750 #09 Y:2007 Reduce the pressure of compressed air to the minimum required $1,287 $6,522
OK0750 #08 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $2,525 $1,000
OK0750 #07 Y:2007 Utilize higher efficiency lamps and/or ballasts $3,081 $5,998
OK0750 #06 Y:2007 Utilize higher efficiency lamps and/or ballasts $3,311 $7,391
OK0750 #05 Y:2007 Install skylights $5,428 $33,634
OK0750 #04 Y:2007 Shut off cooling if cold outside air will cool process $8,272 $16,000
OK0750 #03 Y:2007 Install partitions to reduce size of conditioned space $1,091 $4,248
OK0750 #02 Y:2007 Clean and maintain refrigerant condensers and towers $1,776 $8,988
OK0750 #01 Y:2007 Install timers and/or thermostats $6,319 $1,100
DL0002 #04 Y:2007 Use solar heat to heat make-up air $20,592 $100,100
DL0002 #03 Y:2007 Replace existing chiller with high efficiency model $19,418 $73,950
DL0002 #02 Y:2007 Utilize higher efficiency lamps and/or ballasts $49,771 $62,783
DL0002 #01 Y:2007 Analyze flue gas for proper air/fuel ratio $21,414 $10,000
BD0313 #09 Y:2006 Install occupancy sensors $3,815 $1,275
BD0313 #08 Y:2006 Utilize higher efficiency lamps and/or ballasts $10,038 $10,039
BD0313 #07 Y:2006 Install compressor air intakes in coolest locations $1,780 $800
BD0313 #06 Y:2006 Reduce the pressure of compressed air to the minimum required $3,516 -
BD0313 #05 Y:2006 Install turbulators $2,094 $1,500
BD0313 #04 Y:2006 Recharge batteries on during off-peak demand periods $13,938 -