Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Commercial printing, gravure
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0503 #08 Y:1996 Prevent excessive solvent usage (operator training) $28,200 -
UD0503 #07 Y:1996 Use / purchase optimum sized compressor $5,772 $500
UD0503 #06 Y:1996 Install compressor air intakes in coolest locations $1,120 $600
UD0503 #05 Y:1996 Utilize higher efficiency lamps and/or ballasts $7,143 $31,020
UD0503 #04 Y:1996 Utilize higher efficiency lamps and/or ballasts $449 $500
UD0503 #03 Y:1996 Utilize higher efficiency lamps and/or ballasts $(-368.0) $10,000
UD0503 #02 Y:1996 Utilize higher efficiency lamps and/or ballasts $6,164 $12,748
UD0503 #01 Y:1996 Optimize plant power factor $4,355 $4,000
UD0438 #09 Y:1994 Recover waste heat from equipment $8,000 $40,000
UD0438 #08 Y:1994 Optimize plant power factor $2,880 $36,000
UD0438 #07 Y:1994 Turn off equipment when not in use $549 -
UD0438 #06 Y:1994 Utilize higher efficiency lamps and/or ballasts $1,413 $1,088
UD0438 #05 Y:1994 Utilize higher efficiency lamps and/or ballasts $6,090 $17,120
UD0438 #04 Y:1994 Utilize higher efficiency lamps and/or ballasts $2,367 $6,625
UD0438 #03 Y:1994 Insulate glazing, walls, ceilings, and roofs $14,232 $27,000
UD0438 #02 Y:1994 Use most efficient type of electric motors $7,289 $8,288
UD0438 #01 Y:1994 Replace electrically-operated equipment with fossil fuel equipment $23,133 $30,000
UD0420 #07 Y:1993 Change product design to reduce energy requirements $26,098 -
UD0420 #06 Y:1993 Recover waste heat from equipment $3,897 $3,000
UD0420 #05 Y:1993 Utilize higher efficiency lamps and/or ballasts $1,048 $2,456