ITAC Assessment: NL0017
ITAC logo
ITAC Assessment: NL0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Digital Publishing Magazines
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2754: Commercial Printing, Gravure
Sales Range $100
M
to 500
M
# of Employees 25
Plant Area 578,000
ft2
Annual Production 12,000,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $454,347 9,251,600
kWh
Electricity Demand $107,403 23,270
kW-mo/yr
Electricity Fees $51,173 -
Natural Gas $33,649 5,281
MMBtu
Waste Disposal Costs
Water Usage $96,079 8,408
Tgal
TOTAL YEARLY COSTS $742,651
RECOMMENDED SAVINGS* $32,199 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,415

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,615 $60,000 $12,784
260,600
kWh
$3,831
-
kW-mo/yr
- - -
02 3.4116: Meter recycled water (to reduce sewer charges) $12,800 $2,000 - - - - $12,800
-
Tgal
03 3.4156: Use flow control valves on equipment to optimize water use $2,784 $275 - - $600
-
MMBtu
$2,184
-
Tgal
-
TOTAL RECOMMENDED $32,199 $62,275 $12,784
260,600
kWh
$3,831
-
kW-mo/yr
$600
-
MMBtu
$2,184
-
Tgal
$12,800
-
Tgal
TOTAL IMPLEMENTED $29,415 $62,000 $12,784
260,600
kWh
$3,831
-
kW-mo/yr
- - $12,800
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs