Assessment Year | 2025 |
---|---|
Principal Product | Drywall tape, corner bead, and patches |
NAICS | 327390: Other Concrete Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 31 |
Plant Area |
80,000
ft2
|
Annual Production | 197,000
thousand feet
|
Production Hrs. Annual | 2,375
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $112,386 | 1,084,800 |
kWh
|
$0.10 | |
Natural Gas | $30,527 | 3,361 |
MMBtu
|
$9.08 | |
Waste Disposal Costs | |||||
Water Usage | $7,033 | 980 |
Tgal
|
$7.18 | |
TOTAL YEARLY COSTS | $149,946 | ||||
RECOMMENDED SAVINGS* | $12,232 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Usage Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.7232: Replace existing hvac unit with high efficiency model | $2,048 | $15,495 |
$2,048
19,700
kWh
|
- | - | |
02 | 2.7135: Install occupancy sensors | $320 | $415 |
$320
3,078
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,394 | $4,214 |
$610
5,868
kWh
|
- | $784 | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,362 | $450 |
$1,362
13,100
kWh
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $288 | - |
$288
2,772
kWh
|
- | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $747 | $440 |
$747
7,181
kWh
|
- | - | |
07 | 3.4116: Meter recycled water (to reduce sewer charges) | $6,073 | $110,000 | - |
$6,073
-
Tgal
|
- | |
TOTAL RECOMMENDED | $12,232 | $131,014 |
$5,375
51,699
kWh
|
$6,073
-
Tgal
|
$784 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Water Usage Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs