ITAC Assessment: RU0082
ITAC logo
ITAC Assessment: RU0082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product RUBBER CARPET PADDING
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area
n/a
Annual Production 117,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $607,491 7,030,481
kWh
Natural Gas $50,037 23,531
MMBtu
Fuel Oil #2 $12,635 3,185
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,713 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $9,625 - $9,625
111,958
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $4,107 $72 $4,107
47,773
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,184 - $1,184
13,775
kWh
- -
04 2.4133: Use most efficient type of electric motors $3,942 $14,350 $3,942
45,721
kWh
- -
05 2.2414: Use waste heat from hot flue gases to preheat $11,747 $7,500 - $9,339
-
MMBtu
$2,408
-
MMBtu
06 2.1233: Analyze flue gas for proper air/fuel ratio $3,108 $500 - $2,471
-
MMBtu
$637
-
MMBtu
TOTAL RECOMMENDED $33,713 $22,422 $18,858
219,227
kWh
$11,810
-
MMBtu
$3,045
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs