Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

161

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Commercial printing, lithographic
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
KU0182 #08 Y:1985 Reduce hot water temperature to the minimum required $160 -
KU0182 #07 Y:1985 Use waste heat from hot flue gases to generate steam $801 $1,400
KU0182 #06 Y:1985 Analyze flue gas for proper air/fuel ratio $882 $2,000
KU0182 #05 Y:1985 Install automatic stack damper $3,144 $3,000
KU0182 #04 Y:1985 Install compressor air intakes in coolest locations $418 $700
KU0182 #03 Y:1985 Reduce the pressure of compressed air to the minimum required $2,269 $20
KU0182 #02 Y:1985 Utilize higher efficiency lamps and/or ballasts $14,883 $10,000
KU0182 #01 Y:1985 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $109,167 $1,000,000
KU0162 #11 Y:1985 Install compressor air intakes in coolest locations $391 $150
KU0162 #10 Y:1985 Recover waste heat from equipment $594 $500
KU0162 #09 Y:1985 Install automatic stack damper $405 $700
KU0162 #08 Y:1985 Analyze flue gas for proper air/fuel ratio $395 -
KU0162 #07 Y:1985 Install vinyl strip / high speed / air curtain doors $1,074 $7
KU0162 #06 Y:1985 Install timers and/or thermostats $2,763 $47
KU0162 #05 Y:1985 Utilize higher efficiency lamps and/or ballasts $4,210 $4,973
KU0162 #04 Y:1985 Use demand controller or load shedder $2,058 $3,000
KU0162 #03 Y:1985 Improve lubrication practices $5,315 $2,000
KU0162 #02 Y:1985 Insulate bare equipment $3,684 $782
KU0162 #01 Y:1985 Use adjustable frequency drive or multiple speed motors on existing system $3,801 $4,838
KU0146 #22 Y:1984 Install turbulators $1,530 $1,750