ITAC Assessment: KU0146
ITAC logo
ITAC Assessment: KU0146
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product BATTERIES & GREASE
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 89
Plant Area
n/a
Annual Production 7,380,000
pieces
Production Hrs. Annual 6,024
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $417,559 6,737,104
kWh
Natural Gas $154,510 33,707
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $119,498 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,765

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $26,862 $25,000 - $26,862
-
MMBtu
-
02 2.2515: Use optimum thickness insulation $8,162 $450 - $8,162
-
MMBtu
-
03 2.2511: Insulate bare equipment $1,774 $389 $418
6,741
kWh
$1,356
-
MMBtu
-
04 2.2491: Use cooling air which cools hot work pieces for space heating $540 $600 - $540
-
MMBtu
-
05 2.4312: Improve lubrication practices $2,306 $1,500 $2,306
37,222
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $7,336 $10,562 $7,336
118,406
kWh
- -
07 2.7141: Lower light fixtures in high ceiling areas $8,653 $75 $8,953
144,490
kWh
- $(-300.0)
08 2.3191: Use demand controller or load shedder $17,085 $12,000 $17,085
-
kWh
- -
09 2.3131: Reschedule plant operations or reduce load to avoid peaks $23,806 $3,000 $23,806
-
kWh
- -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $345 $137 $345
5,569
kWh
- -
11 2.4231: Reduce the pressure of compressed air to the minimum required $636 $25 $636
10,258
kWh
- -
12 2.4221: Install compressor air intakes in coolest locations $200 $275 $200
3,224
kWh
- -
13 2.7261: Install timers and/or thermostats $10,168 $5,000 - $10,168
-
MMBtu
-
14 2.6212: Turn off equipment during breaks, reduce operating time $109 - $109
1,758
kWh
- -
15 2.6121: Reduce hot water temperature to the minimum required $215 - - $215
-
MMBtu
-
16 2.6124: Establish equipment maintenance schedule $4,120 - $4,720
76,202
kWh
- $(-600.0)
17 2.1233: Analyze flue gas for proper air/fuel ratio $153 $150 - $453
-
MMBtu
$(-300.0)
18 2.1123: Install automatic stack damper $1,822 $1,400 - $1,822
-
MMBtu
-
19 2.1222: Install turbulators $1,427 $1,176 - $1,427
-
MMBtu
-
20 2.1233: Analyze flue gas for proper air/fuel ratio $428 - - $728
-
MMBtu
$(-300.0)
21 2.1123: Install automatic stack damper $1,821 $1,400 - $1,821
-
MMBtu
-
22 2.1222: Install turbulators $1,530 $1,750 - $1,530
-
MMBtu
-
TOTAL RECOMMENDED $119,498 $64,889 $65,914
403,870
kWh
$55,084
-
MMBtu
$(-1,500.0)
TOTAL IMPLEMENTED $56,765 $23,838 $31,939
239,743
kWh
$26,326
-
MMBtu
$(-1,500.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs