Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

91

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Commercial printing, lithographic
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0778 #12 Y:2008 Use or replace with energy efficient substitutes $853 $310
UD0778 #11 Y:2008 Reduce the pressure of compressed air to the minimum required $1,302 -
UD0778 #10 Y:2008 Install occupancy sensors $1,683 $4,305
UD0778 #09 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $6,692 $5,992
UD0778 #08 Y:2008 Utilize higher efficiency lamps and/or ballasts $1,563 $6,075
UD0778 #07 Y:2008 Utilize energy-efficient belts and other improved mechanisms $2,176 -
UD0778 #06 Y:2008 Turn off equipment when not in use $3,431 $6,000
UD0778 #05 Y:2008 Upgrade controls on compressors $3,783 -
UD0778 #04 Y:2008 Replace air curtain doors with solid doors $5,905 $18,000
UD0778 #03 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $6,222 $22,560
UD0778 #02 Y:2008 Use or replace with energy efficient substitutes $10,780 $12,000
UD0778 #01 Y:2008 Recover waste heat from equipment $77,393 $80,770
UL0246 #05 Y:2000 Reschedule breaks to allow for continuous production $23,625 $2,500
UL0246 #04 Y:2000 Separate and recycle scrap metal to foundry or for sale $121 -
UL0246 #03 Y:2000 Utilize higher efficiency lamps and/or ballasts $6,128 $20,707
UL0246 #02 Y:2000 Install compressor air intakes in coolest locations $220 $44
UL0246 #01 Y:2000 Reduce the pressure of compressed air to the minimum required $1,062 $20
UL0198 #05 Y:1998 Re-arrange equipment layout to reduce labor costs $60,000 $2,000
UL0198 #04 Y:1998 Regrind, reuse, or sell scrap plastic parts $6,748 -
UL0198 #03 Y:1998 Wash and reuse rags on-site $99,250 $150,000