91
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Commercial printing, lithographic | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0778 #12 Y:2008 | 12 | 2008 | Use or replace with energy efficient substitutes | $853 | $310 | |
| UD0778 #11 Y:2008 | 11 | 2008 | Reduce the pressure of compressed air to the minimum required | $1,302 | - | |
| UD0778 #10 Y:2008 | 10 | 2008 | Install occupancy sensors | $1,683 | $4,305 | |
| UD0778 #09 Y:2008 | 09 | 2008 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,692 | $5,992 | |
| UD0778 #08 Y:2008 | 08 | 2008 | Utilize higher efficiency lamps and/or ballasts | $1,563 | $6,075 | |
| UD0778 #07 Y:2008 | 07 | 2008 | Utilize energy-efficient belts and other improved mechanisms | $2,176 | - | |
| UD0778 #06 Y:2008 | 06 | 2008 | Turn off equipment when not in use | $3,431 | $6,000 | |
| UD0778 #05 Y:2008 | 05 | 2008 | Upgrade controls on compressors | $3,783 | - | |
| UD0778 #04 Y:2008 | 04 | 2008 | Replace air curtain doors with solid doors | $5,905 | $18,000 | |
| UD0778 #03 Y:2008 | 03 | 2008 | Use adjustable frequency drive or multiple speed motors on existing system | $6,222 | $22,560 | |
| UD0778 #02 Y:2008 | 02 | 2008 | Use or replace with energy efficient substitutes | $10,780 | $12,000 | |
| UD0778 #01 Y:2008 | 01 | 2008 | Recover waste heat from equipment | $77,393 | $80,770 | |
| UL0246 #05 Y:2000 | 05 | 2000 | Reschedule breaks to allow for continuous production | $23,625 | $2,500 | |
| UL0246 #04 Y:2000 | 04 | 2000 | Separate and recycle scrap metal to foundry or for sale | $121 | - | |
| UL0246 #03 Y:2000 | 03 | 2000 | Utilize higher efficiency lamps and/or ballasts | $6,128 | $20,707 | |
| UL0246 #02 Y:2000 | 02 | 2000 | Install compressor air intakes in coolest locations | $220 | $44 | |
| UL0246 #01 Y:2000 | 01 | 2000 | Reduce the pressure of compressed air to the minimum required | $1,062 | $20 | |
| UL0198 #05 Y:1998 | 05 | 1998 | Re-arrange equipment layout to reduce labor costs | $60,000 | $2,000 | |
| UL0198 #04 Y:1998 | 04 | 1998 | Regrind, reuse, or sell scrap plastic parts | $6,748 | - | |
| UL0198 #03 Y:1998 | 03 | 1998 | Wash and reuse rags on-site | $99,250 | $150,000 |