ITAC Assessment: UL0246
ITAC logo
ITAC Assessment: UL0246
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Lithographic Printed Material
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,561 2,187,866
kWh
Electricity Demand $57,114 6,400
kW-mo/yr
Natural Gas $770 144
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,156 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,062 $20 $729
23,154
kWh
$333
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $220 $44 $151
4,689
kWh
$69
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,128 $20,707 $4,169
133,353
kWh
$1,959
-
kW-mo/yr
- -
04 3.5248: Separate and recycle scrap metal to foundry or for sale $121 - - - $121
-
lb
-
05 4.453: Reschedule breaks to allow for continuous production $23,625 $2,500 - - - $23,625
TOTAL RECOMMENDED $31,156 $23,271 $5,049
161,196
kWh
$2,361
-
kW-mo/yr
$121
-
lb
$23,625
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs