Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,418

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Commercial printing
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0758 #04 Y:2003 Use cooling tower or economizer to replace chiller cooling $14,438 $31,350
GT0758 #03 Y:2003 Reduce illumination to minimum necessary levels $1,895 $47,736
GT0758 #02 Y:2003 Use proper thickness of insulation on building envelope $9,072 $12,000
GT0758 #01 Y:2003 Utilize higher efficiency lamps and/or ballasts $20,720 $47,268
LM0057 #05 Y:2003 Train operators for maximum operating efficiency $47,858 $12,520
LM0057 #04 Y:2003 Re-arrange equipment layout to reduce labor costs $140,025 $42,126
LM0057 #03 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $568 $140
LM0057 #02 Y:2003 Add area lighting switches $2,375 $3,580
LM0057 #01 Y:2003 Utilize higher efficiency lamps and/or ballasts $543 $1,430
SF0250 #05 Y:2002 Contract a wood pallet recycling company $2,268 $300
SF0250 #04 Y:2002 Utilize higher efficiency lamps and/or ballasts $4,727 $10,050
SF0250 #03 Y:2002 Install occupancy sensors $3,986 $2,040
SF0250 #02 Y:2002 Make a practice of turning off lights when not needed $4,087 -
SF0250 #01 Y:2002 Reduce space conditioning during non-working hours $978 -
LE0149 #09 Y:2002 Use waste heat from flue gases to heat space conditioning air $21,044 $10,000
LE0149 #08 Y:2002 Install timers and/or thermostats $4,252 $2,100
LE0149 #07 Y:2002 Install occupancy sensors $472 $75
LE0149 #06 Y:2002 Analyze flue gas for proper air/fuel ratio $886 $750
LE0149 #05 Y:2002 Preheat combustion air with waste heat $11,578 $25,000
LE0149 #04 Y:2002 Recover waste heat from equipment $1,547 $1,200