Assessment Year | 2002 |
---|---|
Principal Product | Wall Covering - Pool Liner - Window Shades |
NAICS |
n/a
|
SIC | 2754: Commercial Printing, Gravure |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
66,035
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 5,760
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $222,944 | 2,044,422 |
kWh
|
$0.11 |
Electricity Demand | $59,618 | 6,338 |
kW-mo/yr
|
$9.41 |
Natural Gas | $167,956 | 26,606 |
MMBtu
|
$6.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $53,057 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,013 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,655 | $340 |
$3,901
48,764
kWh
|
$754
-
kW-mo/yr
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $7,182 | $1,000 |
$5,488
68,600
kWh
|
$1,694
-
kW-mo/yr
|
- | |
03 | 2.2511: Insulate bare equipment | $1,441 | $260 | - | - |
$1,441
-
MMBtu
|
|
04 | 2.2437: Recover waste heat from equipment | $1,547 | $1,200 | - | - |
$1,547
-
MMBtu
|
|
05 | 2.2442: Preheat combustion air with waste heat | $11,578 | $25,000 | - | - |
$11,578
-
MMBtu
|
|
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $886 | $750 | - | - |
$886
-
MMBtu
|
|
07 | 2.7135: Install occupancy sensors | $472 | $75 |
$472
5,910
kWh
|
- | - | |
08 | 2.7261: Install timers and/or thermostats | $4,252 | $2,100 |
$4,252
53,155
kWh
|
- | - | |
09 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $21,044 | $10,000 | - | - |
$21,044
-
MMBtu
|
|
TOTAL RECOMMENDED | $53,057 | $40,725 |
$14,113
176,429
kWh
|
$2,448
-
kW-mo/yr
|
$36,496
-
MMBtu
|
||
TOTAL IMPLEMENTED | $32,013 | $30,725 |
$14,113
176,429
kWh
|
$2,448
-
kW-mo/yr
|
$15,452
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs