ITAC Assessment: UL2208
ITAC logo
ITAC Assessment: UL2208
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Brake and suspension components
NAICS 336330: Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 1,000
Plant Area 600,000
ft2
Annual Production 9,353,293
units
Production Hrs. Annual 7,350
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,298,800 54,968,883
kWh
Electricity Demand $781,899 108,076
kW-mo/yr
Electricity Fees $691,982 -
Natural Gas $374,215 53,619
MMBtu
Waste Disposal Costs
Water Usage $171,206 40,657
Tgal
TOTAL YEARLY COSTS $4,318,102
RECOMMENDED SAVINGS* $136,582 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,079 $9,418 $8,765
208,682
kWh
$3,314
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $1,464 $422 $1,464
35,014
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $35,045 - $25,809
614,511
kWh
$9,236
-
kW-mo/yr
-
04 2.8114: Change rate schedules or other changes in utility service $29,853 - - - $29,853
05 2.9114: Use solar heat to make electricty $58,141 $745,985 $44,147
1,051,123
kWh
$13,994
-
kW-mo/yr
-
TOTAL RECOMMENDED $136,582 $755,825 $80,185
1,909,330
kWh
$26,544
-
kW-mo/yr
$29,853
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs