Assessment Year | 2025 |
---|---|
Principal Product | Cannoli shells |
NAICS | 311812: Commercial Bakeries |
SIC | 2052: Cookies and Crackers |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
34,598
ft2
|
Annual Production | 5,000,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $168,249 | 1,010,430 |
kWh
|
$0.17 |
Electricity Demand | $82,922 | 2,804 |
kW-mo/yr
|
$29.57 |
Electricity Fees | $251,171 | - |
|
- |
Natural Gas | $84,459 | 5,475 |
MMBtu
|
$15.43 |
TOTAL YEARLY COSTS | $586,801 | |||
RECOMMENDED SAVINGS* | $13,705 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8123: Pay utility bills on time | $888 | - | - | - | - | $888 | |
02 | 2.3212: Optimize plant power factor | $2,644 | $9,173 | - |
$2,644
-
kW-mo/yr
|
- | - | |
03 | 2.7232: Replace existing hvac unit with high efficiency model | $1,989 | $7,146 |
$1,242
7,461
kWh
|
$302
-
kW-mo/yr
|
$444
-
MMBtu
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,301 | $75 |
$1,046
6,283
kWh
|
$255
-
kW-mo/yr
|
- | - | |
05 | 2.2511: Insulate bare equipment | $5,554 | $1,800 | - | - |
$5,554
-
MMBtu
|
- | |
06 | 2.7221: Lower temperature during the winter season and vice-versa | $1,329 | - |
$380
2,280
kWh
|
- |
$949
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $13,705 | $18,194 |
$2,668
16,024
kWh
|
$3,201
-
kW-mo/yr
|
$6,948
-
MMBtu
|
$888 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs