| Assessment Year | 2025 |
|---|---|
| Principal Product | Cannoli shells |
| NAICS | 311812: Commercial Bakeries |
| SIC | 2052: Cookies and Crackers |
| Sales Range | $10 M to 50M |
| # of Employees | 90 |
| Plant Area |
34,598
ft2
|
| Annual Production | 5,000,000
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $168,249 | 1,010,430 |
kWh
|
$0.17 |
| Electricity Demand | $82,922 | 2,804 |
kW-mo/yr
|
$29.57 |
| Electricity Fees | $1,705 | - |
|
- |
| Natural Gas | $84,459 | 5,475 |
MMBtu
|
$15.43 |
| TOTAL YEARLY COSTS | $337,335 | |||
| RECOMMENDED SAVINGS* | $13,705 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.8123: Pay utility bills on time | $888 | - | - | - | - | $888 | |
| 02 | 2.3212: Optimize plant power factor | $2,644 | $9,173 | - |
$2,644
-
kW-mo/yr
|
- | - | |
| 03 | 2.7232: Replace existing hvac unit with high efficiency model | $1,989 | $7,146 |
$(-6,036.5)
(-36,255)
kWh
|
$(-1,468.2)
-
kW-mo/yr
|
$9,494
-
MMBtu
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,301 | $75 |
$1,046
6,283
kWh
|
$255
-
kW-mo/yr
|
- | - | |
| 05 | 2.2511: Insulate bare equipment | $5,554 | $1,050 | - | - |
$5,554
-
MMBtu
|
- | |
| 06 | 2.7221: Lower temperature during the winter season and vice-versa | $1,329 | - |
$380
2,280
kWh
|
- |
$949
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $13,705 | $17,444 |
$(-4,610.9)
(-27,693)
kWh
|
$1,430
-
kW-mo/yr
|
$15,998
-
MMBtu
|
$888 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs