ITAC Assessment: UC2417
ITAC logo
ITAC Assessment: UC2417
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Cannoli shells
NAICS 311812: Commercial Bakeries
SIC 2052: Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 34,598
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $168,249 1,010,430
kWh
Electricity Demand $82,922 2,804
kW-mo/yr
Electricity Fees $251,171 -
Natural Gas $84,459 5,475
MMBtu
TOTAL YEARLY COSTS $586,801
RECOMMENDED SAVINGS* $13,705 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.8123: Pay utility bills on time $888 - - - - $888
02 2.3212: Optimize plant power factor $2,644 $9,173 - $2,644
-
kW-mo/yr
- -
03 2.7232: Replace existing hvac unit with high efficiency model $1,989 $7,146 $1,242
7,461
kWh
$302
-
kW-mo/yr
$444
-
MMBtu
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,301 $75 $1,046
6,283
kWh
$255
-
kW-mo/yr
- -
05 2.2511: Insulate bare equipment $5,554 $1,800 - - $5,554
-
MMBtu
-
06 2.7221: Lower temperature during the winter season and vice-versa $1,329 - $380
2,280
kWh
- $949
-
MMBtu
-
TOTAL RECOMMENDED $13,705 $18,194 $2,668
16,024
kWh
$3,201
-
kW-mo/yr
$6,948
-
MMBtu
$888
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs