Assessment Year | 2002 |
---|---|
Principal Product | Molded Products |
NAICS |
n/a
|
SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
Sales Range | greater than $500 M |
# of Employees | 50 |
Plant Area |
24,300
ft2
|
Annual Production | 0
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $25,127 | 1,223,840 |
kWh
|
$0.021 |
Electricity Demand | $28,101 | 3,422 |
kW-mo/yr
|
$8.21 |
Natural Gas | $11,803 | 10,645 |
MMBtu
|
$1.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,481 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,439 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $6,266 | $12,159 | - |
$6,266
-
MMBtu
|
- | |
02 | 2.2511: Insulate bare equipment | $3,865 | $181 |
$3,865
54,434
kWh
|
- | - | |
03 | 2.7124: Make a practice of turning off lights when not needed | $1,993 | $870 |
$1,993
28,067
kWh
|
- | - | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $1,289 | $1,344 | - |
$1,289
-
MMBtu
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $649 | $2,150 |
$649
9,146
kWh
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $586 | - |
$586
8,247
kWh
|
- | - | |
07 | 2.6218: Turn off equipment when not in use | $326 | - |
$326
4,596
kWh
|
- | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $255 | $75 |
$255
3,578
kWh
|
- | - | |
09 | 4.131: Modify process to reduce material use/cost | $252 | $40 | - | - | $252 | |
TOTAL RECOMMENDED | $15,481 | $16,819 |
$7,674
108,068
kWh
|
$7,555
-
MMBtu
|
$252 | ||
TOTAL IMPLEMENTED | $6,439 | $1,126 |
$6,439
90,675
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs