ITAC Assessment: SU0144
ITAC logo
ITAC Assessment: SU0144
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Molded Products
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range greater than $500
M
# of Employees 50
Plant Area 24,300
ft2
Annual Production 0
pieces
Production Hrs. Annual 8,736
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,127 1,223,840
kWh
Electricity Demand $28,101 3,422
kW-mo/yr
Natural Gas $11,803 10,645
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,481 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,439

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $6,266 $12,159 - $6,266
-
MMBtu
-
02 2.2511: Insulate bare equipment $3,865 $181 $3,865
54,434
kWh
- -
03 2.7124: Make a practice of turning off lights when not needed $1,993 $870 $1,993
28,067
kWh
- -
04 2.7243: Improve air circulation with destratification fans / other methods $1,289 $1,344 - $1,289
-
MMBtu
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $649 $2,150 $649
9,146
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $586 - $586
8,247
kWh
- -
07 2.6218: Turn off equipment when not in use $326 - $326
4,596
kWh
- -
08 2.4221: Install compressor air intakes in coolest locations $255 $75 $255
3,578
kWh
- -
09 4.131: Modify process to reduce material use/cost $252 $40 - - $252
TOTAL RECOMMENDED $15,481 $16,819 $7,674
108,068
kWh
$7,555
-
MMBtu
$252
TOTAL IMPLEMENTED $6,439 $1,126 $6,439
90,675
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs